Decks built from the frame up
Most garden decks don't need planning permission, but any part more than 300mm above the ground counts as a raised platform, and on a sloping garden one corner can cross that line. So we measure the whole footprint before we quote. We build composite and timber decks on treated frames, set on ground screws or pads.

- What we build
- Low decks off the back doors, raised and multi-level decks, steps, balustrades and slatted screens
- Under the boards
- Treated frames on ground screws or concrete pads, joists spaced to the board maker's rules, stainless fixings
- Planning
- Over 300mm at any point, or over half the garden with your other additions, needs an application
- Your quote
- Written and itemised after a site visit. A few photos of the garden get it started
Which kind of deck are you planning?
Most of the decks we're asked about fall into one of three jobs. Pick the closest and jump to the part that matters to you.
A low deck off the back doorsThe commonest job. The deck sits below your damp course and clear of air bricks, and we check the far edge stays under the 300mm planning height.
A raised or multi-level deck on a slopeWhere the garden falls away, the frame, steps and guarding become most of the work, and part of the deck may need planning permission before anything is ordered.
A deck with screens, a hot tub or a pergolaPrivacy screens, a tub set into the deck, lights in the fascia or a pergola overhead all change the frame underneath, so we plan them in first.



A garden deck on ground screws, built down a slope
This one was big. A sloping garden in Surrey, behind a house with a glazed extension, turned into decks at more than one level without digging out for concrete pads. The ground screws were set to level on 1 April 2026. On top went a grid of C24 joists on hangers, with black joist tape along the tops so water can't sit in the screw holes and soak into the timber. The steps up the bank stand on cut stringers, and each stringer is backed with a 6x2 to add depth to the throat, so the flight stays stiff when you walk it. The boards are pale grey composite with a charcoal picture-frame border, and the top deck steps down to a lower deck under a louvred pergola. Our caption on 1 May said it: "Deck officially decked. What a job."
- Where
- Surrey
- On site
- April to May 2026
- Our role
- Deck frames, steps and composite boards
- Work
- Decking on two levels, timber steps, ground screw base
What can go into a deck we build?
The boards are the part you see. Most of the time on a deck goes into what's under them and round the edges.

Low decks off the house
Set below the damp proof course, with a small gap at the wall and air bricks left clear, so the house stays dry behind the deck.

Raised and multi-level decks
Frames built up over falling ground, often split into levels so each one stays lower. The raised decking page covers bracing, steps and guarding in detail.

Steps on cut stringers
Stringers cut from solid timber so every rise is the same height, with treads deep enough to take a whole foot without overhanging.
Balustrades and guarding
Guarding is needed wherever a drop passes 600mm. Our balustrades have newels bolted into the frame, never screwed down through the boards.

Picture-frame edges and fascias
A border board mitred round the outside hides the cut ends, and a fascia closes the face of the frame so nothing shows underneath.

Lights in the deck
Plinth and step lights are planned before boarding so the cables run inside the frame. A new outdoor circuit is notifiable, so a registered electrician certifies it.

Decks for garden rooms and hot tubs
A deck as the step out of a garden room, or framed round a hot tub that stands on its own base, with a hatch left for access.
Slatted screens and fencing around a deck
A deck usually wants some privacy, from the houses behind or round a hot tub. When it does, we can build slatted timber screens as part of the same job and plan their posts in with the deck frame. The cedar screen in the photo runs the full length of a new-build garden above rendered planters, with a floating cedar bench built into it.
Height is the rule to watch. Under permitted development a fence, wall or screen can be up to 2 metres high, or 1 metre next to a road used by vehicles or the footpath beside it (GPDO 2015, Schedule 2 Part 2, Class A). Anything taller needs planning permission. And a gate onto a street must not open outwards over the pavement (Highways Act 1980, section 153).

Can you put a pergola over a deck?
Yes, and it's worth deciding before the frame goes in. The pergola posts want their own footings, coming up through or beside the deck, rather than standing on the boards. Leave it until after and the boards have to come up.
Most garden pergolas don't need planning permission, but check with the council if it's attached to the house, in front of it, or on designated land. Oak pergolas and covered seating areas are on our oak frames page.

Decks we've built, frame and finish
Our own photos, with the month each one was taken. Where we have both, you'll see the bare frame next to the boarded deck.

Composite deck round a glazed corner, May 2026, with a charcoal border. 
Mitred composite steps dropping to the lower deck, May 2026. 
The same steps as a bare frame on cut stringers, April 2026. 
Composite deck along a glazed extension, May 2026, edged in charcoal. 
Deck subframe on gravel and membrane, May 2022, before boarding. 
Boarded composite deck, May 2022, with a square left open for a summerhouse base. 
Composite deck at dusk with lights in the fascia, May 2022. 
Composite boards cut round a palm trunk beside a garden room, October 2022. 
Mitred border boards round a Corten planter, December 2024.
Composite, softwood or hardwood: how do the boards compare?
We build in composite and in timber. The board you pick changes the joist spacing, the fixings and the upkeep, so it's worth deciding before the site visit.
| What to know | Composite | Treated softwood | Hardwood |
|---|---|---|---|
| Joist centres | From the board maker's table. Trex sets 400mm as the maximum | Set to the board's span, closer on steps and diagonal layouts | Set to the board's span, closer on steps and diagonal layouts |
| Gaps between boards | To the maker's guide, including end gaps for movement | 5 to 8mm, depending on how wet the board is when it's fixed | 5 to 8mm, set by the moisture in the board when it's fixed |
| Fixings | The maker's own screws or hidden clips | A4 (316) stainless screws | A4 stainless, with every fixing pre-drilled |
| Under the boards | Use Class 4 joists with joist tape on every top | Use Class 4 joists, cut ends treated again | Use Class 4 joists, cut ends treated again |
| When you buy | Warranties vary by maker and can depend on using their fixings | Ask for Use Class 4 in writing. Merchant boards are often Use Class 3 | Ask for FSC or PEFC certified timber |
| Upkeep | A wash with soapy water in spring and autumn | Clean and oil or stain every year or two | Oil to hold the colour, or let it weather to silver |
Composite or timber? If you won't oil a deck every year or two, go composite. It costs more up front and needs a wash, not a coat. Timber costs less, feels warmer underfoot and can be sanded back. Either way, it's the frame underneath that decides how long the deck lasts.
Do you need planning permission for decking?
Most garden decks don't need planning permission, as long as no part of the deck is more than 300mm above the ground next to it. On a sloping garden that's usually the far corner, so a deck that starts level with the patio can end up over the limit at the bottom.
| Rule | What it means for you | Source |
|---|---|---|
| A deck more than 300mm above the ground at any point is a raised platform, which permitted development doesn't cover. | Over 300mm anywhere means a planning application, or a redesign that brings the deck down. | GPDO 2015, Schedule 2 Part 1, Classes A and E |
| On a slope, councils usually check the height at the lowest corner. The 2019 government guidance words ground level differently, so borderline decks can go either way. | Measure at the far edge, not at the back door. If it's close, a Lawful Development Certificate settles it. | Permitted development technical guidance, 2019 |
| Decking under 300mm still counts towards the half of the garden that additions may cover, and can't sit forward of the front of the house. | A deck plus a garden room and a shed can tip a small garden over. Front garden decks need permission. | GPDO 2015, Schedule 2 Part 1, Class E |
| On designated land, no deck between a side wall and the boundary. In a National Landscape, structures more than 20m from the house are capped at 10 square metres in total. | This bites in conservation areas and on the edges of the High Weald and Surrey Hills. | GPDO 2015, Schedule 2 Part 1, Class E.2 and E.3 |
| Flats, maisonettes and the grounds of listed buildings have no permitted development rights for decking. An Article 4 direction can remove them too. | You'll need permission whatever the height. We check this before anything is drawn. | Planning Portal: decking |
| In a house, guarding is needed wherever someone could fall more than 600mm. It should be 1100mm high on balconies, and where children under five may use it, no gap should let a 100mm sphere through. | Even where Building Control isn't involved, these are the heights and gaps to build a raised deck's balustrade to. | Approved Document K |
| Steps in a home: each rise between 150mm and 220mm, each going between 220mm and 300mm, twice the rise plus the going between 550mm and 700mm, and no steeper than 42 degrees. | Every step the same height, with treads deep enough for a whole foot. Uneven risers are what people trip on. | Approved Document K, Table 1.1 |
Who signs it off
- We take levels across the whole footprint at the site visit and tell you which side of 300mm the deck falls.
- If it needs permission, a householder application goes to your council. The council has 8 weeks to decide unless you agree more time.
- If a deck needs planning permission, the Planning Portal says to assume Building Regulations apply as well.
- A new outdoor lighting circuit is notifiable under Part P, so a registered electrician does it and certifies it.
Checked November 2026 against the GPDO 2015, the Planning Portal and Approved Document K
Read the full guide to decking and planning permission
Quick tool: Check whether your deck needs planning permission
What happens between your photos and the finished deck
Seven stages. Planning only comes into it if part of the deck can't be kept under 300mm.
Photos and rough sizes
You
Send three or four photos from the back door and the far end of the garden, rough sizes, your postcode and roughly how much the ground falls.
Site visit and levels
Us
We take levels across the whole footprint, the door threshold and the damp course, and look at air bricks, drains, trees and how materials will get in.
Written quote
Us
Itemised, naming the board, the frame timber, the footing type, the joist centres and the fixings, plus anything that needs planning or an electrician.
Planning, only if needed
You · Up to 8 weeks for a council decision
If part of the deck is over 300mm and can't be brought down, a householder application goes in before anything is ordered.
Footings and frame
Us
Ground screws or pads set to level, then treated joists, hangers and joist tape. Cables for any lights go in now, before a single board.
Boards, steps and guarding
Us
Boards fixed with the right gaps, picture-frame edges and fascias, steps cut to an even rise, and balustrades wherever the drop calls for them.
Walk-round
Us
We walk the deck with you, show you any access hatches, and go through how to clean it and what the board warranty asks of you.
How much does decking cost?
What a deck costs is set more by the ground and the height than by the boards. A sloping garden means a taller frame, steps and guarding, poor ground changes the footings, and some composite boards need closer joists. That's why we don't publish a price. We price each deck once we've measured it.
Height and slope
A taller frame needs bigger timbers, bracing, steps and guarding, and anything over 300mm brings planning into it.
What helps: Ask us about splitting the deck into levels so each one stays low.
Ground and footings
Clay, rubble, roots and wet ground decide whether the frame goes on ground screws or pads, and how many.
What helps: Tell us about old patios, buried concrete and big trees before the visit.
Board choice
Treated softwood sits at the lower end, capped composite and hardwood at the top. Fixings and edge boards follow the board.
What helps: Pick a board family before the survey so the quote matches what you want.
Shape and edges
A rectangle is quickest. Angles, curves, cut-outs and picture-frame borders all add cuts, time and offcuts.
What helps: Keep the plan simple and put the detail where you'll see it most.
Access
Every board, joist and screw has to reach the garden. Carrying it through the house is slower than a side gate.
What helps: Open a fence panel or clear the side path if you can.
Steps, balustrade and screens
Each flight of steps and each metre of balustrade or screen is hours of cutting and fixing.
What helps: Decide where guarding is really needed. A lower deck needs less of it.
Strip-out and waste
An old deck, patio or turf has to come up and go somewhere before the new frame goes down.
What helps: Tell us what's there now, and whether you want any of it kept.
Lighting
Lights mean cables run inside the frame and a visit from a registered electrician.
What helps: Decide where the lights go before the boards are fixed.
What our written quote lists
- Board make, range and colour
- Frame timber and its treatment class
- Footing type and how many
- Joist centres
- Fixings for the boards and the frame
- Steps and guarding, with heights
- Strip-out and waste removal
- Who does the electrics, and what's not included
Ways to spend less without cutting corners
Keep the deck low enough to need no guarding, and keep the shape simple. Plan around standard board lengths so there are fewer joints and less waste. A timber frame costs less than aluminium or recycled plastic, and lights can be added later on an existing circuit if the cables are planned in now. What we won't do is save money on the frame, because that's the part you can't fix later without lifting every board.
To get rough board quantities before you talk to anyone, try our decking and cladding area calculator. For how we put a quote together, read how we quote carpentry jobs.
Got a sloping garden? Send us two photos and the drop from the back door to the far edge, and we'll tell you where you stand.
Get a quoteWhere a cheap deck cuts corners, and what we do instead
You stop seeing the frame the day the boards go down. That's why it's the first place a cheap deck saves money, and why a frame that rots can't be put right without lifting every board.
- The shortcut
Posts concreted straight into soil, or the frame laid on bricks and slabs
What we do insteadGround screws or pads to firm ground, with the timber kept clear of the soil
- The shortcut
Joists at whatever spacing the timber pack allows
What we do insteadJoist centres from the board maker's table, closer on steps and diagonals
- The shortcut
Bare joist tops under composite boards
What we do insteadJoist tape along every top, so water can't sit in the screw holes
- The shortcut
Zinc-plated screws that rust and snap
What we do insteadA4 (316) stainless screws, or the board maker's own fixings
- The shortcut
A wall plate screwed hard to the brick, and the deck built over the damp course
What we do insteadAbout 10mm behind the wall plate, boards below the DPC, air bricks kept clear
- The shortcut
Guarding left off because nobody asked for it
What we do insteadAny drop over 600mm marked at the survey, with guarding written into the quote


Watch the frame and steps go in
We film a lot of our decks as they go up, because the frame is the part nobody sees afterwards. These three show the method on real jobs: framing on ground screws, cutting stringers, and building a deck round a hot tub.




Questions people ask us about decking
Something else? Call or WhatsApp 07494 000065.
How long does it take to build a deck?
It depends far more on the frame than on the boards. A low, square deck on flat ground is a short job. Raised and multi-level decks take longer, because the frame, steps and guarding are most of the work. On our April 2026 deck in Surrey, the ground screws went in on 1 April and the finished deck was photographed on 1 May.
Can you build a deck on a sloping garden?
Yes. We take levels across the whole area, set the height from the back door, then choose between one level with steps or several levels. Splitting a deck into levels can keep each one under the 300mm planning height and the 600mm guarding height, and on a slope it usually looks better too.
Does my deck need a balustrade?
If any edge has a drop of more than 600mm, plan for one. Approved Document K sets guarding at 1100mm high on balconies, with no gap a 100mm sphere can pass through where small children may use it, and that's the standard to build a raised deck's balustrade to. Newels should be bolted into the frame, not screwed through the boards.
What are ground screws?
A ground screw is a galvanised steel pile wound into the ground by machine, and the deck frame fixes to its head. There's no digging, no waiting for concrete and very little spoil, which helps with tight access and near tree roots. On heavy rubble or buried concrete, pads can still be the better choice. We'll tell you which at the survey.
Can the deck go right up against the house?
It can sit beside the house, but it shouldn't bridge the damp proof course or block air bricks. Building Regulations want the DPC at least 150mm above the ground beside the wall, so we keep the deck surface below it, leave about 10mm behind the wall plate for water to run down, and keep air bricks clear or ducted.
How do you stop a deck getting slippery?
Most slips come from algae and leaf litter in shade, not from the boards themselves. Textured composite boards help, and so does air moving under the deck and a slight fall that sheds water. The TDCA code of practice notes that grooves on their own don't add much grip. A wash in spring and autumn keeps any deck safer underfoot.
Can you build a deck round a hot tub?
Yes. A filled hot tub is a heavy, concentrated load, so it should stand on its own base, with the deck framed round it and a hatch left for access. We built one like that in 2024, round a tub on a sandstone patio, with a hidden hatch for the hose. A new outdoor circuit for the tub is notifiable, so a registered electrician does the wiring.
Does a deck need Building Regulations approval?
A freestanding garden deck usually doesn't. The Planning Portal says to assume Building Regulations apply to any deck that needs planning permission, and a deck used as a balcony or built as part of an extension is building work in its own right. If yours is anywhere near that line, we'll say so in the quote.
How long does decking last?
Longer than most people expect, if the frame is right. The TDCA code of practice gives timber posts buried in the ground about a 30 year life, and says to keep timber clear of the ground on a footing for a 60 year design life. Board warranties come from the makers, so ask for the one on the board you pick.
Do you tape the joists under a composite deck?
Yes. Butyl joist tape goes along the top of every joist before the boards are fixed, so rain can't sit in the screw holes and soak into the timber. It isn't a regulation. It's good practice, and on a frame that will sit under boards for decades it's one of the cheapest things you can do to protect it.
Will I need a party wall notice for a deck?
Rarely. A notice is needed for work on a shared wall, and for digging foundations within 3 metres of next door's building and deeper than its foundations. So if the frame fixes to a shared garden wall, or deep footings go near a neighbour's extension, we'll flag it at the quote. Most freestanding decks don't come close.
A deck board or step has snapped. Can you make it safe quickly?
Yes. A broken board, a rotten step or a wobbling handrail is the kind of thing someone gets hurt on, so we treat it as urgent. We cover or cut out the dangerous section, fix the handrail or fence the stairs off, then quote to repair or rebuild. See unsafe decks, stairs and handrails.
Decking installers town by town
Based in Crawley, working across West Sussex and Surrey. Each town page covers the ground, the council and the planning points that change a deck there.
West Sussex
- Decking in CrawleyOur home town. Much of the borough sits on clay, so the footings matter.
- Decking in BillingshurstWeald Clay that shrinks in dry summers, so supports go below the ground that moves.
- Decking in Burgess HillNew estates like Kings Way and Kings Weald, once the planning conditions are checked.
- Decking in CuckfieldConservation area streets and listed houses, where decking rights are tighter or gone.
- Decking in East GrinsteadValley-side plots south of the town, where springs and slopes make drainage matter.
- Decking in Haywards HeathBolnore Village and other wooded slopes, where shade and levels shape the deck.
- Decking in HorshamNewer estates like Highwood and Mowbray, and older gardens on heavy clay.
Surrey
- Decking in CaterhamValley-side plots that fall steeply in a short run, where raised decks are common.
- Decking in CranleighHundreds of new-build gardens since 2018, on clay with a history of flooding.
- Decking in DorkingSteep greensand gardens climbing towards the Surrey Hills, where levels and steps do the work.
- Decking in the villages near GatwickCharlwood, Hookwood and Smallfield, where parts of Hookwood sit in Flood Zone 3.
- HorleySurrey, Reigate & Banstead planning, wet clay by the Mole, and every address in Gatwick's crane zone.
- Decking in LingfieldShaded, tree-lined plots where airflow under the boards and root-friendly footings matter.
- Decking in OxtedDeep gardens on sand around the town and on clay at Hurst Green.
- Decking in RedhillSmaller gardens on estates such as Watercolour and Royal Earlswood Park.
- Decking in ReigateSloping plots on Reigate Hill, where one corner of a deck can pass 300mm.
Worth reading before you choose boards
Thinking about a new deck?
A few photos of the garden from the back door are enough to start. Add rough sizes and tell us how much the ground drops towards the far end. We'll look at what you send and come out to take levels before anything is priced.
Useful to send
- Three photos: from the back door, from the far end, and of the way in
- Rough sizes and how far the ground drops
- Your postcode