Roofs framed, repaired and rebuilt
We're carpenters who build and repair the timber that holds a pitched roof up: rafters, purlins, hips, valleys and fascias, cut by hand on site across Sussex and Surrey. When the tiles come off and the rot shows, it doesn't get a quick patch. We find the cause and fix the structure before anything gets covered.

- What we build
- Cut roofs, rafter and purlin repairs, hips, valleys, barn ends, fascias, and roof prep for the roofer
- Building Regs
- Re-covering over half the roof, or a quarter of the whole outside, needs approval and better insulation
- Heavier tiles
- A new covering 15% or more heavier than the old one needs Building Control and a structural check
- Your quote
- Written and itemised, with scaffold as a fixed line and hidden timber shown as an allowance
Which job is yours?
Most roof enquiries fall into one of three camps.
- Something's wrong with the roof you haveRotten rafter feet, a ridge that dips, cracks where the walls meet the roof, or a leak nobody's found. It starts with finding out why the timber failed.
- You're adding a roofA new cut roof on an extension, a hip tied into the old roof, a porch canopy or a dormer as part of a loft. We set it out and cut it on site.
- It's a flat roofFlat roofs have their own page: joists, firrings, deck, insulation and falls, built as a warm deck so the structure stays dry for good.



A cut roof with steels, under a temporary roof
This one sat on steels on a big period house, all built under a temporary scaffold roof so the building stayed dry while the old structure came out. The drawings called for 8 by 3 rafters at 300mm centres. That's a lot of timber, and a lot of cuts. We worked out the lengths and angles, cut the bulk of the roof on the ground in five days, then lifted each piece into place. The old chimney stack stayed, so the rafters either side of it had to be trimmed round it and the stack boxed in. Some of the time went on sorting out what earlier builders had left behind, which is normal on an older house: you don't know what you're dealing with until it's open. Everything went in to the spec and the drawings. Our verdict on camera was that it was probably one of the most over-engineered roofs we've done.
- Where
- Location kept private
- On site
- April 2025
- Our role
- Cutting and fitting the roof timbers to the drawings
- Work
- New hipped cut roof on steels
What we do on a pitched roof
Everything below is carpentry: the structure, the edges and the set-up the covering depends on.
Roof timber repairs and sagging roofs
Rotten rafter feet and wall plates, cracked rafters sistered or replaced, new purlins, and dipped ridges brought back. More on roof timber repairs.

Cut roofs for extensions
Wall plate, rafters, ridge, hips, valleys and jacks, cut on site and tied into your existing roof so the two read as one.

Dormers and roof alterations
Trimming the opening, framing the dormer cheeks and roof, hip-to-gable changes. Usually part of a loft conversion.
Fascias, soffits and bargeboards
Old boards off, rafter feet checked and cut to a line, new boards on. Never plastic capped over rot. See fascias and soffits.

Roof prep for the roofer
Eaves line, sprockets, fascia height, tilting fillet and valley boards, all set so the tiles sit true from the first course.
Porches, bays and canopies
Small hipped and lean-to roofs over doors and bays. Same carpentry as a big roof, cut to fit the brickwork. More below.
Trussed roofs and flat roofs
Factory trusses are a different job, on our truss roof erection page. Flat roofs are on flat roofs.
Small roofs: porches, bays and canopies
A porch canopy or a little lean-to over the back door gets built the same way as a whole house roof, only smaller: a wall plate, hips, jack rafters and a ridge, cut to sit tight against the brickwork. They're often the first roofs on a house to rot, because they sit low, catch the weather and rarely get looked at.
If a bay or porch roof is leaking, the cause is often where it meets the wall: a tired flashing, or a board under the covering that's gone soft. Both are worth sorting before the plaster inside starts to show it.
A ground-level porch under 30 square metres, separated from the house and not heated by the house's system, is exempt from the energy rules. If you want a framed oak porch rather than a canopy, that's on our oak frames page.

Who does what on a roof
Most pitched roofs are two trades, sometimes four. The carpenter builds the part that holds everything up: wall plates, rafters, purlins, hips, valleys and the fascia line. The roofer lays the membrane, battens and tiles, and does the lead. An engineer designs anything structural that's out of the ordinary, and Building Control checks the work where the rules say it has to.
The trouble usually starts when the tiles come off and there's rot underneath. Plenty of roofing firms don't carry a carpenter, so the rafter feet get a quick patch and the job carries on. We work the other way round. We find out why the timber failed, sort it, and leave the roof set up so the covering goes on right first time.
That set-up matters more than people think. A wavy fascia, or rafter feet cut off the line, shows in every course of tiles above it. Our rule for rafter feet: level for the soffit, plumb for the fascia, a string line, and every foot cut to it.

The parts of a pitched roof
Roofers, carpenters and surveyors all talk in trade words. Here's what they mean, with the word you'd probably use first.
| You might say | We'd call it | What it does |
|---|---|---|
| The point at the top | Ridge | The line where two slopes meet. Rafters land on a ridge board or, on bigger roofs, a beam or steel. |
| Roof beams | Rafters | The sloping timbers that carry the battens and tiles, spaced to the drawings or span tables. |
| The big beam halfway up | Purlin | Runs along each slope under the rafters so they can span further without sagging. |
| Props in the loft | Struts and binders | Struts carry the purlins down onto a load-bearing wall. Binders stiffen the ceiling joists. Cut them out and the roof can drop. |
| Loft floor joists | Ceiling joists | Carry the ceiling below and tie the rafter feet together so the walls aren't pushed outwards. |
| The wood on top of the wall | Wall plate | Bedded level on the wall. The rafters sit on it and restraint straps hold it down. |
| Roof corner | Hip and jack rafters | A hip is the sloping outside corner where two slopes meet. Short jack rafters run from it to the wall plate. |
| Where two roofs meet | Valley | The inside corner where rain from two slopes runs together. It needs a valley board and good leadwork or a valley system. |
| Roofline | Fascia, soffit, bargeboard | The fascia carries the gutter, the soffit closes under the eaves, and the bargeboard finishes the gable edge. |
Roofs we've built
All our own photos, grouped by job. Most were taken under a temporary scaffold roof, hence the light.

Cut roof on steels, April 2025. Common and jack rafters landing on the wall plate. 
Cut roof on steels, April 2025. A run of 8 by 3 rafters at 300mm centres. 
Cut roof on steels, April 2025. New hips framed round the retained chimney stack. 
Cut roof on steels, April 2025. Steel, purlin and chimney breast inside the new roof. 
Hipped extension roof, February 2023. Hips, jacks and commons meeting at the ridge. 
Hipped extension roof, February 2023. Built under a temporary roof beside the old slates. 
Hipped extension roof, February 2023. Jack rafters run from the hip to the plate. 
Barn-end roof, November 2024. Two hipped barn ends, roof complete on day four. 
Hipped cut roof, October 2024. Hips, jacks and ridge meeting at one point. 
Hipped roof frame in treated softwood, looking up at the hip junction. 
Curved new-build roof, September 2023, built with a specialist roof team. 
Curved new-build roof, September 2023. Steep rafters following the curve of the wall.
Re-using tiles, heavier tiles, felt or membrane
Three questions come up on nearly every re-roof. Here's what usually happens, and what we check before anyone orders anything.
| The question | Usually | What we check |
|---|---|---|
| Can we keep the old tiles? | Clay tiles, often yes. The sound ones are sorted, topped up with matching tiles and go back on new battens and membrane. Concrete tiles that are crumbling or worn through aren't worth saving. | How many are cracked or flaking, and whether matching tiles can still be found. |
| Can the roof take heavier tiles? | Changing the covering, say slate to concrete tiles or interlocking tiles to clay plain tiles, can add a lot of weight. A new covering 15% or more heavier needs Building Control approval. | Old and new weights from the makers' data, the rafter and purlin sizes, and whether an engineer needs to see it. |
| Felt or breathable membrane? | A breathable membrane on most re-roofs, with eaves and ridge ventilation worked out at the same time. Old bitumen felt works, but only if the roof is well vented. | Where air gets in at the eaves and out at the ridge, and that loft insulation isn't blocking it. |
A dry loft comes from airflow, not from the label on the roll.

Warm pitched roofs and rooflights
If the loft is going to be a room, the insulation moves from the loft floor into the slope of the roof, between and under the rafters. That's a warm pitched roof. It changes the carpentry: rafters often need deepening to fit enough insulation, the ventilation is planned differently, and condensation risk has to be checked. For new work on an existing home, the energy rules set a limit of 0.15 W/m²K for a new roof, and the 2027 changes don't change the insulation targets for extensions or renovations. There's more in our guide to warm and cold roofs.
A rooflight means cutting rafters and trimming the opening either side, which is structural carpentry. A replacement rooflight has to reach 2.2 W/m²K. A rooflight is usually permitted development if it sticks out no more than 150mm from the roof slope and sits below the highest part of the roof. Unlike a dormer, that can still apply in a conservation area or National Landscape, though listed buildings need consent and some councils remove the right with an Article 4 direction. Bigger changes belong with a loft conversion.
Do you need permission for a new roof?
Replacing the tiles on more than half your roof usually needs Building Regulations approval, and the roof's insulation has to come up to standard at the same time. Planning is rarely needed unless the roof changes shape, you're adding a dormer on protected land, or the house is listed.
| Rule | What it means for you | Source |
|---|---|---|
| Re-covering more than 50% of the roof, or more than 25% of the house's whole outside, is renovating a thermal element | Building Control approval, or a competent person certificate for the covering, and the insulation brought up to standard | Building Regulations 2010, regulation 23 |
| Stripping a roof back to the rafters counts as renovation, and the improved roof U-value is 0.16 where it pays back | The insulation upgrade applies to re-roofs, not just new roofs. In a cold loft that's typically about 250mm of mineral wool or cellulose at ceiling level | Approved Document L Volume 1, paras 11.2 and 11.3, Appendix C |
| A new covering 15% or more heavier than the old one needs approval, as does any structural alteration | A change of covering often triggers it. We check the timbers before you order tiles | Planning Portal: work to an existing roof |
| Competent person schemes can self-certify a replacement roof covering, but not structural work | A registered roofer can sign off a like-for-like re-cover. New or altered roof timbers go through Building Control | Building Regulations 2010, Schedule 3 |
| Re-roofing like for like normally needs no planning permission | A new shape, a raised ridge or a dormer may. Flats and maisonettes have no householder permitted development for roofs | Planning Portal: roofs |
| Dormers can be permitted development (40m³ on a terrace, 50m³ otherwise), but never on Article 2(3) land | In a conservation area, the High Weald or Surrey Hills National Landscape or the South Downs National Park, a dormer needs planning permission | GPDO 2015, Schedule 2, Part 1, Class B |
| Listed buildings need listed building consent for most roof work | Including like-for-like repairs where the character is affected. Talk to the council's conservation officer first | Planning (Listed Buildings and Conservation Areas) Act 1990 |
Who signs it off
- Building Control, or a roofer in a competent person scheme: the covering and the insulation
- Building Control: any new or altered roof timbers
- Your council: planning, conservation areas and listed buildings
- A structural engineer: strengthening, heavier coverings, steels or anything coming out
Checked November 2026 against the Planning Portal, Approved Document L and the GPDO
Planning permission or Building Regulations: which do you need?
Bats, asbestos and party walls
Three things stop roof jobs halfway, and all three are easier sorted before the scaffold goes up.
Bats. All British bats are protected. Damaging or destroying a roost is an offence whether you meant to or not, and the penalties run to six months in prison and an unlimited fine. Old tiled roofs near woodland, which covers a lot of the Weald, are just where they like to be. If we find bats, we stop. You'll need a survey, and if a licence from Natural England is needed, the work gets planned around it. We found bats on a Sussex roof in November 2024, and it changed how the rest of that job was done. See the gov.uk bat guidance.
Asbestos. Houses built in the decades after the war, which includes much of Crawley, can have asbestos insulating board soffits or an asbestos cement undercloak at the verges. If it's suspected, it gets tested. Most removal of insulating board is licensed work, so a licensed contractor takes it out before the roof work starts. The HSE lists where it turns up.
Party walls. On a semi or a terrace, cutting into the shared wall for a purlin bearing, a steel or a flashing chase is notifiable under the Party Wall etc. Act 1996. Work on a shared wall, like cutting in steels or removing a chimney breast, needs a party wall notice at least two months before it starts. Like-for-like re-tiling usually doesn't. We'll tell you at the survey if your job needs one, so the two months goes into the programme instead of holding it up.
How a re-roof runs
Every roof is different once it's open, but the order rarely changes. This is how a typical job goes.
Send us photos
You
A few of the roof from the street and the garden, one or two of the loft with a torch, and your postcode. That's enough for a first view.
We look at the roof
Us
In the loft, at the eaves and the verges: what the covering is, the state of the timber, the insulation and ventilation, and any sign of bats or asbestos.
Paperwork before work
Building control · Party wall notice: at least two months
The right approval route is chosen: full plans, a building notice, or a competent person certificate for the covering. An engineer's design comes first if anything structural is changing.
Your written quote
Us
Itemised, with the scaffold as its own line, hidden timber work shown as an allowance, and anything not included written down, so nothing turns up later.
Timber checked and sorted
Us
With the covering off, every rafter foot, wall plate and purlin gets looked at. Repairs, straps, the fascia line and the roof prep are done before anything is covered.
Inspection and sign-off
Building control
The structure is inspected before it's covered where that's required. At the end you get the completion certificate, or the scheme certificate for the covering.
What does a new roof cost?
What a roof costs comes down to the scaffold, the shape, the covering and what's under the tiles, and nobody knows that last one until they're off. That's why we don't publish a price. You get a written, itemised quote after we've seen the roof, with hidden timber shown as a separate allowance.
Scaffold and access
Height, how many sides need it, a temporary roof on bigger strips, and access over a neighbour's land or the road. Often the biggest single line on a re-roof.
What helps: Tell us about parking, shared paths and side access when you send photos.
Size and shape
A plain gable is quick. Hips, valleys, barn ends, dormers and chimneys mean more cuts, more lead and more time.
What helps: Send a photo of every side of the roof, not just the front.
What's under the tiles
Rotten rafter feet and wall plates only show once the covering's off.
What helps: Ask for hidden timber work as a separate allowance, with how it's worked out written down.
Covering and its weight
Clay, slate and concrete tiles differ a lot, and a heavier covering can mean strengthening the roof first.
What helps: Decide whether you're matching the old covering or changing it before the survey.
Structural work
New purlins, steels or strengthening need an engineer's design and Building Control.
What helps: If you have drawings or engineer's calculations, send them with your enquiry.
Fascias, soffits and gutters
The material and the length of run. It makes sense to do them while the scaffold is up.
What helps: Think about timber, PVC or composite boards before we visit.
Insulation and ventilation
Re-covering more than half the roof brings in the Part L insulation upgrade, and the ventilation is designed with it.
What helps: Tell us if you might use the loft as a room later, because that changes where the insulation goes.
Lead and chimneys
Flashings, soakers and lead valleys, and any chimney that's staying, coming down or being rebuilt.
What helps: Decide what happens to redundant chimneys before the quote.
What our written quote lists
- Scaffold, as a fixed line
- Stripping the old covering and taking the waste away
- Timber repairs as a separate allowance, with how it's worked out written in words
- Membrane, battens and ventilation
- The covering, ridge, hips and lead, or a note of who's doing them
- Fascias, soffits and gutters
- The Building Control route and who applies
- What isn't included
What a provisional sum is
Nobody can price rotten timber they can't see. So instead of guessing high to cover every outcome, the quote carries an allowance for hidden timber work and says how it's worked out. That's a provisional sum. Once the covering's off, we show you what's there. If the timber's sound, the allowance isn't spent. If there's more to do than allowed for, you hear about it before the work's done, not on the final bill.
Want your roof's area and rafter lengths first? Try the roof pitch calculator, and read how we quote.
Quick tool: Work out pitch, rafter length and roof area
Roof leaking, sagging or about to be opened up for an extension? Send us photos of the roof and the loft and we'll tell you what we see.
Get a quoteA proper job, and what we won't do
Once the tiles are on, nobody sees the timber again. That's exactly why it's worth doing right.
- The shortcut
Plastic fascia capped over the old rotten board
What we do insteadOld boards off, rafter feet checked and repaired, new boards fixed to a line
- The shortcut
Struts or purlins cut out to make more loft space
What we do insteadNothing structural comes out without an engineer's design for what replaces it
- The shortcut
Ridge and hip tiles held on with mortar alone
What we do insteadRidges and hips mechanically fixed, as BS 5534 has required since 2015, or a BS 8612 dry-fix system
- The shortcut
Rafter feet cut by eye, so the fascia waves
What we do insteadLevel for the soffit, plumb for the fascia, a string line, and every foot cut to it
- The shortcut
Heavier tiles ordered without checking the roof can take them
What we do insteadOld and new weights compared, the timbers checked, and an engineer brought in if it's close
- The shortcut
Insulation stuffed into the eaves
What we do insteadEaves kept open so air gets in, with trays or vents over the wall plate
- The shortcut
Twisted or wet timber built in because it's what turned up
What we do insteadGraded, stamped timber, and anything twisted or wet goes back. In our experience, timber is worse than ever

From the tools
We film most roofs as they go up. These three show the bits you never see once the tiles are on.



Questions people ask us about roofs
Something else? Call or WhatsApp 07494 000065.
Do roofers replace rafters, or do I need a carpenter?
Some roofers will swap a rafter foot or two. Anything bigger, like a run of rotten rafters, a sagging ridge, new purlins or a wall plate that's gone, is carpentry, and on a lot of roofs it ends up being guessed at. That's the part we do. We find out why the timber failed, put it right, and leave the roof ready for the covering.
What is a cut roof?
A cut roof is built on site from loose timber. We set out the wall plate, then cut every rafter, hip, valley and jack to fit, usually working out the lengths and angles on the ground first. It's the traditional way to build a roof, and the sensible one when the shape is awkward or the new roof has to tie into an old one.
Cut roof or trussed roof for an extension?
Trusses are made in a factory to a designer's layout, so they go up quickly on a plain shape. A cut roof takes longer to build, but it leaves more usable loft space than standard trusses, copes with hips, valleys and odd angles, and ties into an existing roof more easily. Often the drawings decide. If yours say trusses, see our truss roof erection page.
Is my roof cut or trussed, and does it matter?
Look in the loft. Trussed rafters are triangles with diagonal webs, joined with metal nail plates and set close together. A cut roof has rafters, a purlin along each slope and struts down onto a wall. It matters because a truss must never be cut or altered without the truss designer or an engineer agreeing, so loft plans and rooflights need checking first.
How do I know if my roof timbers are rotten?
Look in the loft with a torch. Dark, soft or crumbly wood at the eaves, white mould on the timber, daylight where there shouldn't be any, or a ridge that dips in the middle are all worth a call. Most rot starts at the rafter feet, behind the fascia, where water from a blocked gutter or a slipped tile sits.
Why is my roof sagging?
Usually one of three things: tiles heavier than the roof was built for, struts or ties cut out years ago to make loft space, or rot. We find the cause before we fix anything, because propping a ridge without knowing why it dropped just moves the problem. If it's structural, an engineer designs the repair.
Do I need a structural engineer for roof work?
Not for simple like-for-like repairs. You do if the roof is being strengthened for a heavier covering or solar panels, if struts or purlins are coming out, if a steel is going in, or if the roof is spreading the walls. The engineer designs it and Building Control checks it. On extensions, the drawings usually come with the calculations already done.
How long does a new cut roof take?
On an extension, the roof frame itself usually takes us four or five days with two carpenters on it, before the roofer starts. In November 2024 a roof with two hipped barn ends was complete on day four. In April 2025 we cut the bulk of a much bigger roof on steels in five days. Weather, deliveries and what we find on the old roof all move it.
Will my house be open to the weather while the roof's off?
On a bigger strip, the scaffold firm can put a temporary roof over the whole job, often called a tin hat. Our February 2023, November 2024 and April 2025 roofs were all built under one, so the house underneath stayed dry while the old roof came off. It's an extra on the scaffold, so ask about it at the quote stage.
Do new roofs need restraint straps?
Yes. A roof has to be tied down so wind can't lift it. Planning Portal's guidance describes straps about 1.2 metres long fixing the wall plate to the inner wall at 2 metre centres, and gable walls are strapped back to the roof timbers too. If an older roof has none, it's worth adding them while the roof is open.
Do you do emergency roof repairs?
We make storm-damaged roofs safe around the clock with tarpaulins, battens and boarding over holes, then come back for the permanent repair to the timbers and coverings. Our storm-damaged roofs page covers what can be done in the dark and what has to wait for daylight.
Roof work across Sussex and Surrey
We're based in Crawley and work across West Sussex and Surrey. Each town page covers the houses, roofs and council rules you'll meet there.
West Sussex
- Roofing in CrawleyPlenty of 1950s to 1970s new-town houses, so soffits get an asbestos check first.
- Roofing in BillingshurstStane Street village on Weald Clay, with over 80 timber-framed buildings in the parish.
- Roofing in Burgess HillVictorian terraces, 1970s trussed roofs and Brookleigh's new homes, with Weald Clay underneath.
- Roofing in CuckfieldListed and timber-framed houses in the old village need consent for most roof work.
- Roofing in East GrinsteadTile-hung Wealden houses, with the High Weald close by, where dormers need planning.
- Roofing in Haywards Heath1930s semis and tile-hung Wealden houses with hipped clay roofs.
- Roofing in Horsham1930s semis with hipped clay roofs, and heavy Horsham stone on some older houses.
Surrey
- Roofing in CaterhamTandridge's 2026 neighbourhood plan codes, hung-tile houses and steep valley plots on the North Downs
- Roofing in CranleighWeald Clay village beside the Surrey Hills, with a conservation area and big post-war estates.
- Roofing in DorkingA conservation area centre ringed by the Surrey Hills, on greensand with Weald Clay villages south
- Roofing around GatwickCharlwood's listed cottages, Smallfield's wet ground and three councils, all just north of our Crawley base.
- HorleySurrey, Reigate & Banstead planning, wet clay by the Mole, and every address in Gatwick's crane zone.
- Roofing in LingfieldSurrey village inset from the Green Belt, with one conservation area and a design statement
- Roofing in OxtedTandridge town inset from the Green Belt: sand in the centre, clay at Hurst Green
- Roofing in RedhillVictorian terraces with slate roofs, cut timbers and a party wall each side.
- Roofing in ReigateVictorian terraces and 1930s semis, so party wall notices often come into it.
Worth reading before a roof job
Warm roof or cold roof for a flat roof?Over a heated room, build a warm roof.
How we quote, and what sets the numberWe don't publish prices, because the same job description can hide very different work.
Planning permission or building regulations: which do you need?They're two separate approvals that answer different questions.
Send us photos of your roof
Send us photos of your roof and we'll tell you what we see. A few from the street and the garden, one or two of the loft, and your postcode is plenty to start. Then we come and look, and you get a written quote.
Useful to send
- Photos of the roof from the street and the garden
- A photo or two inside the loft, taken with a torch
- Your postcode, and any drawings you already have


