Roofing in Oxted
Most of Tandridge is Green Belt, and for houses outside the village boundaries the council measures additions by volume against the house as it stood in 1968, roof space included. A dormer counts. We frame and repair roofs in Oxted and Limpsfield with that sum done first.

Tandridge council, Greensand ridge, RH8
- Planning
- Tandridge District Council
- Building control
- Southern Building Control Partnership (Tandridge's council building control)
- Highways and county
- Surrey County Council
- Postcodes
- RH8, RH9
- From our base in Crawley
- About 13 miles north-east
The 1968 rule and Limpsfield's clay roofs
Green Belt volume
Policy DP13 compares any extension with the original house, meaning the house on 31 December 1968, or as first built if later. Volume is measured externally and includes roof spaces, so a large dormer can use up much of what is allowed.
Limpsfield conservation area
Its appraisal wants dormers set down from the ridge and eaves, says flat roofs will not normally be supported where permission is needed, and asks for orange clay tile with an uneven look. Dark machine-made tiles are unlikely to be accepted on older buildings.
Oxted's own conservation areas
Old Oxted, Station Road West (1990) and Broadham Green with Spring Lane (1990). There's no Tandridge village conservation area, despite what some sites say, and no Article 4 direction covers roofs here.
Building control records
Tandridge's building control is the Southern Building Control Partnership, and its records can be searched online if you need to know what was approved on your house before.
Railway-era roofs and the Hurst Green estates
New Oxted grew around the station between 1884 and 1914: solid brick, stucco and mock-Tudor fronts under steep clay tile, with tile-hung gables. Those roofs are tall, which makes them good for loft rooms, and the gables are where battens tend to rot. Hurst Green and Holland are post-war, with schools opening in 1960 and 1971, and they sit on Weald Clay rather than the Folkestone Beds under the town. Our one Oxted job so far was a garden deck in April 2026, so there's no Oxted roof to show you yet.
What Oxted owners ask about roofs
Something else? Call or WhatsApp 07494 000065.
We live outside the Oxted boundary. How big a dormer can we have?
It depends on what has already been added since 1968. Tandridge adds up the volume of earlier extensions, conservatories and roof spaces against the original house. If there's room left, a dormer may be acceptable; if not, rooflights are a lighter option. An architect can work out the numbers, and we frame to the approved design.
Our Limpsfield house needs re-roofing. Do we have to use handmade tiles?
Not always, but the conservation area appraisal asks for orange clay with an uneven appearance, and dark machine-made tiles are unlikely to be accepted on vernacular buildings. If the house is listed, the conservation officer will usually expect handmade or reclaimed clay. Like-for-like work on an unlisted house is less tightly controlled.
Can an Oxted gable that is tile hung be repaired without re-roofing?
Yes. The gable wall and the roof slope are separate jobs. The hanging tiles come off the gable, the rotten battens and any soft timber behind are replaced, and the tiles go back up. The roof itself is only touched if the verge or bargeboard has failed too.
Is a loft conversion in an Edwardian Oxted house straightforward?
More than most, because the roofs are tall and steep, so there is usually standing room under the ridge without lifting it. The work is in the detail: turning ceiling joists into a floor, trimming round the chimney, and fitting a stair that meets the fire rules. Inside the town, a rear dormer outside the conservation areas may be permitted development.
From first look to final inspection
We start with a visit: up in the loft, round the outside, and onto the scaffold if one is already up. You get a written quote that lists what is in and what is out. Where building control or the council has a say, we tell you before work starts and book the inspections. The roofing page covers the work itself in more detail.