How a job runs, from first photo to handover
Every home job we take on runs through the same seven steps, from the photos you send us to the walk-round at the end. Here's what happens at each one, who does what, and the few things you can do that keep a job moving.

1. You send us photos, or give us a ring
Start however suits you. Ring or WhatsApp us on 07494 000065, or fill in the enquiry form.
Photos help more than anything else. One wide shot of the whole area and a close-up or two of the awkward bits tell us more than a page of description. Add rough sizes if you have them, the postcode, and roughly when you'd like the work done. If there are drawings, a planning approval or an engineer's design, send those too.
You don't need the trade words for any of it. A line about what's there now and what you want instead is plenty.

2. We talk it through on the phone
We go through what you've sent and ring you back. The first call is about the job itself. What do you want to end up with? Is there a date it has to fit round, like a kitchen delivery or a baby due?
On that call we're also listening for the things that change what happens next. Does the work touch a load-bearing wall, a wall you share with next door, or the front of the house? Those can mean an engineer, Building Control, a planning application or a party wall notice, and it's better to know now than after a quote.
If it isn't a job for us, we'll say so on that call. If it is, we arrange to come and see it.
3. We come out and look at the job
Most jobs need measuring before anyone can price them properly, so we come out to see it. While we're there we measure up and look at what the new work has to fix to or sit on, because that's usually where the surprises are. A deck depends on how the garden falls. A new opening depends on what's above it. A flat roof depends on what state the joists are in.
We'll also check the practical side: where the van can park, where materials and a skip can go, and how we get timber in without carrying it through your hall.
It's your chance to ask questions, so have any drawings to hand and walk us round what you want.

4. You get a written quote
The quote sets out the work as we've agreed it with you: what we'll build, the materials and who supplies them, and what isn't included. Where something can't be priced until it's opened up, such as rafter feet hidden behind a fascia, it's listed on its own as a provisional sum. That way you can see which part of the total could move, and why.
There are no prices on this website because every quote is for one particular job. If you're comparing ours with others, line them up like for like: same scope, same materials, provisional sums kept apart and the total with VAT included. Our guide to comparing builders' quotes shows how.
Read it through and ask about anything that isn't clear. Take your time over it.
5. We book you in and get the paperwork moving
Once you say yes, we agree a start date and order the materials. Some jobs also need paperwork in place before anyone sets foot on site, and the notice periods are set by law:
- Building control has to be told at least two days before work starts, again within five days of work starting, and again within five days of completion.
- Work on a shared wall, like cutting in steels or removing a chimney breast, needs a party wall notice at least two months before it starts.
In the weeks before we arrive, clear the rooms we'll be working in and make the choices that affect our work, such as door handles, flooring or the worktop. If you're buying any materials yourself, get them ordered early so they're here before we need them.
6. We're on site, and you know what's happening
We keep you up to date as the work goes: what's happening this week, anything we've found, and any decision we need from you. If you need us, ring 07494 000065. On building work the other trades come in through us, so it's still one number.
When we're your only contractor, the client's Building Regulations and site safety duties pass to us by law. Keeping the site safe and tidy is our job, not something you should have to ask for.
On work that needs approval, Building Control inspects at the stages it sets, usually before the structure gets covered up. And if something turns up that changes the job, we stop and talk to you before going any further.

7. Sign-off, paperwork and looking after it
At the end we walk round the finished work with you and write down anything that isn't right yet: a door that catches, a gap in the sealant, a scuff on a skirting. Then we put those right.
Next comes the paperwork. That means the completion certificate from Building Control where the job needed approval, certificates from the electrician or any other trade who signs off their own work, and the product warranties for what we fitted. Keep them all together. A buyer's solicitor will ask for them when you sell.
We'll also tell you how to look after what we've built, from oiling new timber to washing down composite boards. If something isn't right after we've gone, ring us.

What makes a job go well, from our side of it
We put it in a caption in July 2026, about a roof made ready for the roofer: "We take pride in our work whether it's seen or not." Most of what we build ends up under tiles, plaster or deck boards. That hidden part is where we're fussiest.
The jobs that go best have a few things in common. The decisions get made before we start, not halfway through. The paperwork is in place before the first day on site. Each side has one person who makes the calls, and every change gets agreed in writing. None of that is complicated, and it saves more time than anything we can do with a saw.

What people ask about how a job runs
Something else? Call or WhatsApp 07494 000065.
What happens if the job turns out bigger than the quote?
We stop and show you before doing anything extra. Old houses hide things, rotten joist ends, a missing lintel, a steel that isn't where the drawings say, and finding them is part of the job. We explain the options, price the change and only carry on once you've agreed it in writing. Anything listed as a provisional sum in your quote is adjusted to what the work actually took, and we'll show you how we got there.
Can I change my mind about part of the job once you've started?
Usually, if it's early enough. Moving a socket before the plasterboard goes up is easy. Moving it afterwards means cutting into a finished wall. Tell us as soon as you know, and we'll tell you what the change affects: the price, any materials already ordered and the finish date. We agree it in writing before we make it, so the final bill matches what you agreed.
Can I cancel after I've agreed to go ahead?
Usually, yes, within 14 days, if you agreed the contract at home, by phone or online rather than at our premises. That's your right under the Consumer Contracts Regulations 2013, and the information you're given should explain how to use it. If you ask us to start within those 14 days, you can still cancel, but you'll pay for the work done up to then. The right doesn't cover a contract to build a new home. The rules are in regulation 36.