First and second fix, for builders and homeowners
First fix is the timber you'll never see once the plasterer has been: stud walls, joists, noggins and door linings. Second fix is everything you will: doors, skirting, architrave and boxing. We do both, for homeowners and for builders working to a programme.

- First fix
- Stud walls, joists, door linings and noggins, before the plasterer arrives
- Second fix
- Doors, skirting, architrave and boxing in, once the plaster is dry
- For builders
- Programme work on extensions and new builds across Sussex and Surrey
First fix and second fix, explained
Same carpenter, two visits, with the electrician, the plumber and the plasterer in between. A second fix can only be as good as the first fix it's fixed to.
Doing up your own house, or running a site?
The carpentry is the same either way. Homeowners usually need it as part of a bigger job; builders need carpenters who turn up on the weeks the programme says.
Stud walls and partitions
A stud wall is a timber frame, a sole plate on the floor, a head plate on the ceiling and upright studs between them at 400mm or 600mm centres, boarded both sides. It's how you split a big bedroom into two, put a WC under the stairs or build an en suite.
Door openings are framed as the wall goes up, and the opening is the door width plus 3 inches, which leaves room for the lining and the packers. A wall next to a bedroom or a room with a toilet needs sound insulation, so the cavity gets mineral wool rather than being left hollow to boom like a drum. And if the wall carries any load, or the frame sits under a new steel, it's designed first and checked by Building Control.
A new internal wall generally needs Building Regulations approval, because it can change your fire escape route, your sound insulation and your ventilation. Planning permission isn't needed for an internal wall unless the house is listed.

The fixings you'll wish you'd planned
Once the plasterboard is on, there's nothing behind it to screw into except the studs, and they're never where the TV bracket wants to go. So before we board, we ask where things will hang: the TV, radiators, kitchen wall units, curtain poles and blinds, a heavy mirror, a grab rail by the toilet. Noggins or ply go in between the studs at those heights, and it's worth photographing the wall before the boards go on.
In new homes built to the accessible and adaptable standard, bathroom and WC walls have to be strong enough for grab rails and seats, which is first fix work too.


Boxing in pipes, and the access panel you'll need later
Boxing hides soil pipes, heating pipes and ducts. The mistake is boxing in a stopcock, a valve or a rodding eye with no way back to it, so the first leak means cutting the boxing open. Wherever something might need turning off or clearing, we leave a removable panel and tell you where it is.
On a downstairs WC in March 2022, the MDF boxing round the cistern pipes went in with one panel marked "removable" before it was painted.
Floors, joists and decking
On an extension, the first fix starts with the floor or ceiling joists. The joists at the top of this page are C24, hung between steels over a blockwork extension in June 2022 and decked in Egger P5 chipboard. C24 is the stronger, straighter strength class of structural softwood. P5 is the load-bearing chipboard made for humid conditions, usually laid tongue and groove, glued and screwed.
Joists are set out to the engineer's design and checked level across the run, because a floor that's out shows up in the ceiling below and in every door above. Where plumbers or electricians need to run services through, the routes are agreed first, so nobody notches a joist where it shouldn't be notched.

Loft stairs and openings in the floor
Getting a stair into a loft means cutting through ceiling joists and trimming the opening so the load still goes somewhere. It's structural, so it's designed and goes through Building Control. Headroom usually decides where the stair can land: Approved Document K wants 2m, or 1.9m at the centre and 1.8m at the side in a loft conversion where space is tight.
A loft room that adds a storey more than 4.5m above the ground also needs fire-resisting doors onto the stair, at least E 20, and partitions of at least REI 30. That often means upgrading the existing doors downstairs too. The stair in this photo went in through a loft floor framed with studs and OSB in 2022. Our loft conversions page covers the whole job.

Second fix: the part you'll see every day
Second fix starts once the plaster is dry: door linings finished and doors hung, then architrave, skirting, window boards, boxing and loft hatches. The gap between the two visits is usually a few weeks, while the electrician and plumber do their first fix and the plaster dries out. Longer in a cold, damp winter, because joinery fixed to wet plaster moves.
Doors are where you notice a rushed second fix. The lining has to be plumb and free of twist, and the door is undercut to the finished floor, so the floor finish needs deciding before the doors are hung. Our reels show the details. There's more on skirting and architrave on our skirting and architrave page, and on doors on our internal doors page.


First and second fix for builders and developers
On someone else's site we work from the drawings and the programme: first fix when the shell is up, second fix once the plaster's dry, and the weeks agreed before we start. The photo shows the internal walls of a timber frame house in 2024, framed under a scaffold roof before the floors were fully decked.
Subcontract carpentry for a contractor normally comes under the Construction Industry Scheme, where the contractor deducts money from payments and passes it to HMRC. The VAT domestic reverse charge can also apply between VAT-registered businesses on construction services reported under CIS. Ask us about both when you send the drawings. The detail on how we work on your site is on our trade page, and commercial partitions are under commercial work.

What a proper first and second fix looks like
Most of these take a few extra minutes each. Skip them and you find out months later, when a door won't close or a bracket pulls out of the wall.
- The shortcut
Door linings nailed into whatever the opening gives
What we do insteadLinings packed plumb and checked for twist with string lines before the plasterer comes
- The shortcut
Door openings framed by eye
What we do insteadThe opening framed at the door width plus 3 inches, leaving room for the lining
- The shortcut
Hinge recesses hacked out once the lining is up
What we do insteadHinges chopped into the lining legs before it's assembled
- The shortcut
Door stops set tight to the door before paint
What we do insteadA 3mm gap at the stop, so the door still closes once it's painted
- The shortcut
Bathroom doors left bare underneath, on two hinges
What we do insteadThe underside primed in damp rooms, and a third hinge to stop the door bowing
- The shortcut
A random undercut, or none at all
What we do insteadThe undercut set to the finished floor, so air can move under the door
- The shortcut
Bedroom and WC walls left hollow
What we do insteadMineral wool in the cavity, so the wall meets Part E and doesn't boom

Before we arrive: what to decide before first fix
These are the questions that are easy to answer before the boards go on, and expensive after.
- Where the TV, radiators, wall units, blinds and any grab rails will go
- Which walls need sound insulation: anything next to a bedroom or a WC
- Door sizes and which way each door opens
- The floor finish and its thickness, so linings and undercuts are set right
- Where valves, stopcocks and meters are, so boxing gets an access panel
- Whether the job needs Building Control, and who has notified it
- The plastering date, so second fix is booked once it's dry
- Skirting and architrave profile and height, and the door style
Send us the drawings, or photos and rough sizes, and tell us where you are on the programme. We'll tell you what's involved.
Get a quoteTimber or metal stud: which suits your wall?
Both are boarded the same way. The difference is what's behind the board when you come to hang something.
| What matters | Timber stud | Metal stud |
|---|---|---|
| Hanging heavy things | Screws straight into the studs and noggins | Needs timber or plates added inside the frame first |
| Straightness | Good with planed CLS timber, which can still move as it dries | Dead straight, and stays that way |
| Door openings | Framed and lined in timber as the wall goes up | Needs timber built in round the opening for the lining |
| Where it suits | Most house jobs: bedrooms, en suites, lofts | Long runs on bigger jobs, and suspended ceilings |
Our reels show both: timber stud walls on most of our house jobs, and metal furring grids for suspended ceilings.
How much does first and second fix carpentry cost?
We don't publish prices, because first and second fix depends on what's already done. A clean shell with full drawings is a different job from a house where we're working round the family. What moves the number is below, and you get a written quote once we've seen the drawings or the site.
Drawings and how complete they are
Clear drawings with door sizes and wall positions let us cut lists before we arrive. Gaps get worked out on site.
What helps: Send the latest drawings, and say which bits aren't decided yet.
Programme and site readiness
Turning up to a shell that isn't watertight, or plaster that isn't dry, means a return visit.
What helps: Give us the dates for the roof, the trades and the plasterer.
Who supplies the materials
Timber, boards, doors and ironmongery bought by you need checking and storing; bought by us, they're in the price.
What helps: Tell us what's already ordered and when it lands.
Repetition
Ten doors of the same size go quicker than ten different ones, and house-type work goes quicker than a one-off.
What helps: Keep door sizes and ironmongery the same where you can.
Access and storage
Long timber and sheets have to get in and stay dry, and a third-floor flat slows every trip.
What helps: Tell us about parking, stairs and where materials can be kept.
Ironmongery count
Every handle, lock, latch and closer is fitting time, and fire doors take more.
What helps: List the doors with the ironmongery each one gets.
What our written quote lists
- The first fix and second fix items, room by room or plot by plot
- Who supplies timber, boards, doors and ironmongery
- The number of visits, and what each one covers
- What depends on other trades or on Building Control
- What isn't included
Comparing quotes
A first and second fix quote that doesn't list the doors, the walls and who supplies what isn't comparable with one that does. Our guide to how we quote carpentry jobs shows how the number is built.
Do I need Building Regs for a stud wall?
Usually, yes. A new internal wall generally needs Building Regulations approval, because it can affect your fire escape route, sound insulation and ventilation. It matters most when the wall carries load, creates a room you can only reach through another room, or sits next to a bedroom or toilet. Planning permission isn't needed unless the house is listed.
| Rule | What it means for you | Source |
|---|---|---|
| Work to provide a new internal wall generally requires Building Regulations approval. | Most new partitions go through Building Control, and the frame is inspected before it's boarded. | Planning Portal: internal walls |
| A loft conversion that adds a storey above 4.5m needs fire-resisting doors of at least E 20 and partitions of at least REI 30, upgrading existing doors where necessary. A new wall must not create an inner room, except for a few room types. | New walls and doors in a loft or on the stair are part of the house's fire design, so they're built to it. | Approved Document B Volume 1, paragraphs 2.11 and 2.21 |
| New internal walls between a bedroom or a room with a WC and other rooms should reach Rw 40 dB. Walls containing a door, and a wall between an en suite and its bedroom, are exempt. | Mineral wool in the cavity and the right board on bedroom and WC walls. | Approved Document E |
| Internal doors should give a free area equal to a 10mm undercut: 10mm above the floor finish, or 20mm above the floor if the finish isn't down yet. | We need to know the floor finish before the doors are hung. | Approved Document F Volume 1 |
| In accessible and adaptable homes (M4(2)), walls, ducts and boxings to the WC, bathroom and shower room should take grab rails and seats imposing up to 1.5kN/m². | Noggins and ply in those walls at first fix, before the boards go on. | Approved Document M Volume 1, paragraph 2.26 |
| Cutting into a party wall to take the bearing of a beam needs a party wall notice at least two months before the work starts. | Joists or a steel into a shared wall wait for the notice, so it goes in the programme early. | The Party Wall etc. Act 1996: explanatory booklet |
Who signs it off
- No competent person scheme covers carpentry, so notifiable work goes to your council's Building Control or a registered building control approver.
- Whoever notified Building Control books the inspections, and nothing gets boarded over before the inspector has seen it.
- On a domestic job with one contractor, the client's health and safety duties under CDM 2015, and the dutyholder duties in the Building Regulations, pass to that contractor.
Checked November 2026 against the Planning Portal, Approved Documents B, E, F and M, and the Party Wall booklet
Planning permission or Building Regulations: which do you need?
Recent first and second fix from our own posts
Real jobs from our Instagram, dated where the post gives a month.

Five stud walls up round a ground floor WC, ready for noggins, January 2022. 
P5 chipboard deck laid over the new joists on an extension, June 2022. 
Floor joists, strutting and stud walls on a timber frame house, January 2024. 
Internal walls and joists inside the scaffold on the same timber frame build, January 2024. 
Second fix on an oak veneer door: routed latch and brass knobs, January 2022.
Questions people ask us about first and second fix
Something else? Call or WhatsApp 07494 000065.
What's the difference between first fix and second fix?
First fix is the carpentry before plaster: studs, joists, linings, noggins and the other hidden timber. Second fix is after the plaster's dry: doors, skirting, architrave, window boards and boxing. It's usually the same carpenter on two visits, with the electrician, the plumber and the plasterer in between.
How long is the gap between first and second fix?
Usually a few weeks, while the electrician and plumber do their first fix and the plaster dries. It's longer in a cold, damp winter, because joinery fixed to wet plaster moves and the gaps open later. We'd rather give you honest dates than hopeful ones.
Do I need Building Regs for a stud wall?
Usually, yes. The Planning Portal says a new internal wall generally needs approval. It matters most if the wall is load-bearing, if it creates a room you can only reach through another room, or if it's next to a bedroom or toilet and needs sound insulation. Planning permission isn't needed unless the house is listed.
Can you hang a TV on a stud wall?
Yes, if there's timber behind it. Tell us where the TV, wall cupboards and radiators will go before we board, and we'll put noggins or ply in the right places. Without them, a bracket is only held by plasterboard fixings, and a heavy TV on an arm will pull them out over time.
Can you soundproof a stud wall?
We can make it much quieter. Walls next to a bedroom or a room with a toilet need sound insulation under Part E, so the cavity is filled with mineral wool and boarded with the board the spec calls for. That cuts noise a lot, but no stud wall is truly soundproof, and a door in it will always leak some sound.
Can you put a door in a stud wall?
Yes. The opening is framed as the wall goes up, at the door width plus 3 inches so there's room for the lining and packers. If you want a pocket door that slides into the wall, it needs a wall long enough to take the whole door, and the frame goes in at first fix.
Can you fit doors before the floor goes down?
We can, but we'd rather not. The undercut depends on the finished floor, and Approved Document F wants the equivalent of a 10mm gap under the door for air to move. If the floor isn't down yet, the door is set 20mm off the subfloor, which looks wrong if the floor ends up thinner than planned.
Can you box in pipes?
Yes. We frame the boxing, moisture-resistant board is the better choice in a bathroom or WC, and we leave a removable panel wherever there's a valve, a stopcock or a rodding eye. That way a leak or a blockage doesn't mean cutting the boxing open.
Do you work for builders and developers?
Yes. We take first and second fix on extensions, new builds and timber frames, working from the drawings and to the programme. Send the drawings and the dates, and we'll tell you which weeks we can cover. Our trade page has the detail.
Do you inspect or sign off the work yourselves?
No. There's no competent person scheme for carpentry, so notifiable work like a new wall or a loft stair is signed off by your council's Building Control or a registered approver. We make sure each stage is ready for the inspector, and nothing gets covered up before they've seen it.
Where we do first and second fix
We're based in Crawley and work across West Sussex and Surrey, from Horsham and Haywards Heath to Reigate, Dorking and Oxted.
West Sussex
- First and second fix in CrawleyOur home town: fourteen neighbourhoods on clay and sandstone, with Gatwick's crane zone to the north.
- First and second fix in BillingshurstStane Street village on Weald Clay, with over 80 timber-framed buildings in the parish.
- First and second fix in Burgess HillVictorian terraces, 1970s trussed roofs and Brookleigh's new homes, with Weald Clay underneath.
- First and second fix in CuckfieldTwo conservation areas, a 1995 Article 4 direction and the High Weald on the village edge.
- First and second fix in East GrinsteadMid Sussex ridge town with a timber-framed High Street and High Weald edges
- First and second fix in Haywards HeathSix conservation areas, railway villas, Bolnore's wooded estate, plus Balcombe and Ardingly in the High Weald.
- First and second fix in HorshamFour conservation areas, Victorian terraces, post-war bungalows and new estates at Mowbray and Highwood.
Surrey
- First and second fix in CaterhamTandridge's 2026 neighbourhood plan codes, hung-tile houses and steep valley plots on the North Downs
- First and second fix in CranleighWeald Clay village beside the Surrey Hills, with a conservation area and big post-war estates.
- First and second fix in DorkingA conservation area centre ringed by the Surrey Hills, on greensand with Weald Clay villages south
- First and second fix near GatwickCharlwood's listed cottages, Smallfield's wet ground and three councils, all just north of our Crawley base.
- HorleySurrey, Reigate & Banstead planning, wet clay by the Mole, and every address in Gatwick's crane zone.
- First and second fix in LingfieldSurrey village inset from the Green Belt, with one conservation area and a design statement
- First and second fix in OxtedTandridge town inset from the Green Belt: sand in the centre, clay at Hurst Green
- First and second fix in RedhillA railway town in a greensand gap, split between two councils under one RH1 postcode
- First and second fix in ReigateConservation streets, Article 4 rules and three soils under one old Surrey market town
Worth reading before first fix starts
First fix and second fix carpentry, explainedFirst fix is the carpentry that goes in before plaster: stud walls, joists, floor decks, door linings and noggins.
Planning permission or building regulations: which do you need?They're two separate approvals that answer different questions.
How we quote, and what sets the numberWe don't publish prices, because the same job description can hide very different work.
Got walls to frame or doors to hang?
Send us the drawings if you have them, or photos and rough sizes if you don't, with your postcode and where you are on the programme. We look at what you send and you get a written quote.
Useful to send
- Drawings, or photos and rough sizes
- Where you are on the programme, and the plastering date
- Your postcode, and whether Building Control is involved