Crawley chalet house clad in vertical oak effect composite boards beside a stone chimney, snow on the lawn

A 1970s Crawley house reclad in composite boards

In autumn 2022 we stripped the tile hanging off this 1970s chalet-style house in Crawley and reclad it in vertical oak-effect Millboard boards, working alongside a landscaping firm. The old tiles, membrane and battens came off, new breather membrane and treated battens went on, and the boards went over the top.

Where
Crawley, West Sussex
On site
October to December 2022
Property
1970s chalet-style detached house
Our role
Strip-out and cladding, alongside a landscaping firm

The front of the house after the reclad, December 2022.

What the house looked like before

This is a detached 1970s chalet-style house in Crawley, with a stone chimney breast and an integral garage. Before we started, the gables and the front were hung with red-brown shaped tiles, a finish you see on plenty of Sussex houses. The job was to take the tile hanging off and replace it with cladding.

We did the carpentry: the strip-out, the new membrane and battens, and the boards. It was a joint job with a landscaping firm we often work alongside.

The front of the house, before and after

BeforeBefore: a 1970s chalet style house with red brown tile hanging on the gables and a stone chimney
AfterAfter: the same house clad in vertical oak effect composite boards, with snow on the lawn

Before, with the old tile hanging, and after, in vertical oak-effect Millboard, photographed in December 2022.

How the reclad went, from tiles off to boards on

We posted it in parts as it went, so most of these stages are on film further down the page.

  1. Tiles off

    Us

    October 2022. Working from the scaffold, we stripped the old hanging tiles off the gables and the dormer cheeks, back to the blockwork. We posted it on our Instagram as part one of the cladding job, with more to come.

  2. Old membrane and battens off

    Us

    With the tiles gone, the old membrane and battens came off too. We don't fix new battens over old ones. You'd be building the new wall on something you haven't seen.

  3. New membrane and treated battens

    Us

    New breather membrane went over the wall, then treated battens were fixed through it, ready to take the boards.

  4. Vertical boards on

    Us

    The Millboard boards were cut on the ground, passed up the scaffold and fixed vertically, first under the windows and then right across the gables. One of the clips below shows a whole gable filling up in a single timelapse.

  5. Lead and the last details

    Us

    With the new face on, the lead flashings needed redressing to sit over it. Our post on 16 October flagged it: "Lead to be redressed!" The finished house was photographed in the snow that December.

Why the membrane and battens matter more than the boards

The boards are what you see, but the layers behind them decide how the wall copes with weather. The battens hold the boards off the wall and leave a gap behind them, so any rain that gets past the boards can run down and out, and air moving through the gap dries what's left. The membrane keeps wind-driven rain off the wall itself while still letting moisture vapour out of it.

Behind old tile hanging you often find felt that has gone brittle and battens that have gone soft. That's why we take it all back to the wall rather than patching. It makes the strip-out longer, but the new cladding starts on a wall we've actually looked at.

Watch the tiles come off and the boards go on

Three clips from our Instagram, all filmed on this house in October 2022.

Part one: stripping the tile hanging Filmed from the scaffold, with a voice-over: the old red tiles come off a gable back to the blockwork, then new breather membrane and treated battens are fixed ready for the boards.
Membrane to finished boards, in stop-motion A first-floor wall goes from bare membrane and battens to finished oak-effect boards under the windows, frame by frame.
A gable reclad in one timelapse A fixed camera on the scaffold watches two carpenters work along the lift as the battened gable fills with vertical boards.

Old tile hang out, membrane and old battens off, new membrane and battens on, nicely finished off with a Millboard cladding.

Our Instagram, posting the before and after photos, 18 December 2022

Recladding a tile-hung house in Crawley

If your house has tile hanging that's slipping, cracked or just tired, start with a photo of each wall and a rough idea of the sizes. We'll look at what's on there now, how the scaffold would go up and what's likely to be behind the tiles before anything is priced.

Our page on cladding in Crawley covers the local side. The main cladding page compares larch, cedar, Accoya and composite boards and explains the fire and planning rules.

Thinking of recladding your house?

Send us a photo of each wall and tell us roughly how big they are. We'll look at what's on there now and what's likely behind it, then come out to measure before anything is priced. We're based in Crawley and work across West Sussex and Surrey.

Useful to send

  • A photo of each wall, wide and close up
  • Rough sizes of each wall
  • Your postcode