Wood floors, laid on a level base

A floor is only as good as what's under it. We check moisture and flatness before anything is laid, fix squeaks and level subfloors ourselves, then fit engineered or solid wood, laminate or patterned floors with the expansion gaps hidden under skirting, not covered with beading.

Low view across a black and white chevron floor being laid, a fitter kneeling in the background
A black and white chevron floor going down in a newly plastered room with bifold doors.
Before we lay
Moisture and flatness checked before a single board goes down
Edges
Boards run in under the skirting, with no scotia beading
Subfloors
Levelled, repaired and squeaks fixed by us, not another trade
Floors
Engineered and solid wood, laminate, herringbone and chevron

What we lay

Most of the floors we fit are wood or wood-look boards, laid as part of a kitchen, an extension or a whole-house refurbishment. This is what we lay, and the work underneath that makes it last.

  1. Freshly laid engineered oak boards across an open plan flat with a white staircase beyond

    Engineered and solid wood

    Oak and other hardwoods, glued down or floated on underlay. Engineered boards suit screed and underfloor heating best.

  2. Empty room with a grey oak effect laminate floor and new white skirting all round

    Laminate

    Click-together boards on the right underlay, scribed in under the skirting the same way as a wood floor.

  3. Glossy black and white herringbone floor meeting new white skirting along a plastered wall

    Herringbone and chevron

    Pattern floors set out from a centre line, so the pattern runs square to the room and finishes evenly at both walls.

  4. Bare screed floor in an extension with a roll of underlay and stacked flooring packs

    Subfloors and squeaks

    Loose boards screwed down, chipboard and ply laid on joists, and low spots levelled before the new floor goes on.

Solid or engineered wood, glued or floating?

Solid wood is one piece of timber all the way through. Engineered wood has a hardwood top layer bonded onto layers of ply or softwood, and that build makes it far more stable. It shrinks and swells less as the house warms up and dries out, which is why it's the safer choice over screed and underfloor heating. Solid wood can be sanded back more times over its life, so it suits a floor you plan to keep for decades in a room where the conditions don't swing. On engineered boards, what limits sanding is the thickness of the top layer. A full sand takes off about 1mm, so check that thickness before you buy.

Then there's how it's fixed. A floating floor is laid on underlay and joined board to board, not fixed down. It's quicker, and it suits a flat, dry subfloor and most click-together boards. A glued floor is stuck to the screed or ply with flooring adhesive spread with a notched trowel. It feels more solid underfoot and sounds less hollow. Solid boards on joists are usually secret nailed instead. Which method suits your room comes down to the board, the subfloor and the heating, and the maker's fitting guide settles it.

It starts with the subfloor

Most floors that fail do it because of what's underneath. A board floor laid on a dip rocks, creaks and opens at the joints. Ted Todd's fitting guide asks for no more than 3mm of deviation under a 2m straight edge, and that's the test we work to before anything goes down. Joists get checked for level and packed or planed where they're out. Loose floorboards get screwed down so they stop squeaking. Old boards past saving come up for new chipboard or ply, glued and screwed with the sheets staggered so no joints line up. Screed gets ground down where it's high and levelled where it's low.

Then moisture. A new screed holds a lot of water, and laying wood on it too early is the classic expensive mistake. Ted Todd asks for cement screed to test below 2% on a CM test, or 75% relative humidity with a damp-proof membrane under the floor. Anhydrite screed has to be much drier, 0.5%, or 0.3% with underfloor heating. As a rough guide, a cement screed dries at a day per millimetre for the first 40mm, then two days per millimetre after that, and never in less than 30 days. A 65mm screed takes about 90 days. The test, not the calendar, decides when we lay. Timber subfloors want to be about 12% moisture content and within 2% of the flooring.

Old floors bring one more check. Old thermoplastic tiles and the black bitumen adhesive under them can contain asbestos. If we find them, we stop and you get them tested before anything is lifted.

Engineered oak boards being laid over green foam underlay, with a scribing compass and pencil
Our work, February 2022. Engineered oak going down over foam underlay, scribed round a cupboard.

Room conditions, acclimatising and underfloor heating

Wood moves with the air around it, so the room has to be close to how it'll be lived in before the boards arrive. Ted Todd asks for 16 to 24°C and 45 to 65% relative humidity, with the heating on for five days before fitting, and the boards left in the room to acclimatise for two to three days. Wood flooring is ideally one of the last jobs on a refurbishment. Plastering, screeding and painting all put water into the air, and a floor laid among them takes it in.

Underfloor heating and wood get on well with a few rules. The heating has to be run up and commissioned before the floor goes down, which Ted Todd sets out as a 15-day cycle, and turned down again before fitting. Once the floor is in, the surface shouldn't go above 27°C and the water in the pipes shouldn't go above 35°C. Run it hotter and the boards dry out, shrink and gap. Vinyl floors run to their own rules, so whatever the floor, the maker's fitting guide is the one to follow.

Electric underfloor heating needs a new circuit, which is notifiable electrical work. Your electrician does that part and signs it off. We lay the floor once they're done.

Expansion gaps, skirting and doors

A wood floor has to have room to grow. Ted Todd asks for a gap of at least 15mm round the edge of the room, against walls, steps, pipes and door frames. The tidy way to hide it is to take the skirting off, lay the floor into the gap and put the skirting back on top. The quick way is to leave the skirting on and nail scotia beading along the bottom of it, which always looks added on. We take the skirting off. Where skirting is going back new, our skirting and architrave page covers the fitting. Round door frames we undercut the architrave and lining so the boards slide underneath, instead of cutting the board round the moulding.

Doors are the other catch. A new floor and underlay will usually sit higher than what was there before, so the doors need trimming to keep about a 10mm gap above the finished floor. Work out the difference by adding the new floor and underlay thickness and taking away the old one. That's roughly what comes off the bottom of each door, and it's neater done before the doors are rehung than with them on the hinges. Our doors page covers it from the door's side.

Where a floor meets a kitchen, the order matters too. Floor under the units, or units first and floor to the plinth? Both work, but it has to be decided before the kitchen goes in, not on the day.

Oak effect plank floor in a white rear extension with green expansion spacers along the walls
Our work, July 2021. Oak-effect floor in an extension, spacers still holding the gap at the walls.

Herringbone and chevron floors

Pattern floors are slower than plain boards, and almost all of the extra time goes on setting out. The pattern has to run square to the room and look even at both walls, so before the first block goes down we find the centre line of the room, usually lined up with the main doorway or the longest wall, and work out from it. A herringbone or chevron that starts against a wall that isn't true will drift, and by the far side of the room the pattern is visibly out.

Herringbone uses rectangular blocks laid at right angles, with each end meeting the side of the next one. Chevron uses blocks cut at an angle at the ends, so they meet point to point in a clean zigzag. Both throw away more material at the edges than plain boards, because every block that meets the wall gets cut. How much depends on the room shape and the size of the blocks, so allow extra when you order, and buy it all from the same batch so the colour stays even. Our area calculator works out the floor area to order from.

In October 2026 we posted a feature inlay set into a floor. It's the kind of detail that only works when the setting out underneath is spot on.

Do I need permission or Building Regs for a new floor?

Usually neither. A new floor inside your house isn't development, so it needs no planning permission, and laying one isn't normally building work. The exceptions are a listed building, renovating more than half of a ground floor, a new electric heating circuit, and any old flooring that might contain asbestos.

RuleWhat it means for youSource
Planning permissionWork that only affects the inside of a building isn't development, so a new floor doesn't need planning permission.Town and Country Planning Act 1990, section 55
Listed buildingsIn a listed building, taking up historic floorboards or flagstones can need listed building consent, because it can affect the building's character.Planning (Listed Buildings and Conservation Areas) Act 1990, section 7
Renovating a ground floorRenovating more than half of a ground floor, such as digging out an old solid floor, can mean it has to be insulated to a U-value of 0.25 W/m²K, where that is feasible.Building Regulations 2010, regulation 23
Electric underfloor heatingA new circuit for electric underfloor heating is notifiable electrical work. A registered electrician does it and signs it off.Building Regulations 2010, regulation 12
Old tiles and black adhesiveOld floor tiles and the bitumen adhesive under them can contain asbestos. They need testing before they're lifted, sanded or drilled.HSE: where you can find asbestos

Who signs it off

  • You: checking your lease for flooring rules if you're in a flat
  • Your electrician: the circuit for electric underfloor heating
  • Building Control: insulation when most of a ground floor is renovated
  • An asbestos surveyor: testing old tiles or black adhesive

Checked November 2026 against the Town and Country Planning Act 1990, the Building Regulations 2010, Approved Document L and HSE asbestos guidance

Floor tips from site

Short clips from our Instagram, filmed on our own jobs. Each one covers the part of a floor you don't see once it's down.

Setting out a chipboard subfloor Standing on the joists of a new build, one of our carpenters explains where to start the sheets, why they're staggered and glued, and how to stop a subfloor rocking. Posted in December 2024.
Gluing engineered oak to a screed Adhesive spread with a notched trowel and wide engineered oak boards pressed into it across an open-plan room. Posted in July 2024.
A floor build-up before underfloor heating In an insulated garden room, the insulation boards across the slab and the slip sheet that goes down before the underfloor heating and screed. Posted in September 2024.

How much do floor fitters charge?

We don't publish prices, because the boards are rarely what decides the time. A flat, dry screed in a square room is quick. Squeaky boards, a wet screed, a pattern, skirting off and on, doors to trim and stairs all add time. So we look at the room and price your floor in writing.

  1. Floor type and pattern

    Click boards go down fastest, glue-down takes longer, and herringbone or chevron takes longest

    What helps: Choose the floor before you ask for a quote

  2. Subfloor work

    Levelling a screed, screwing down boards or laying new chipboard comes before the floor

    What helps: Lift a corner of the old floor if you can, so we can see what's under it

  3. Moisture

    A screed that isn't dry means waiting, or a damp-proof membrane before the floor

    What helps: Tell us when the screed went down and how thick it is

  4. Skirting off and on

    Taking skirting off, laying under it and refitting it is slower than beading, and looks far better

    What helps: Decide whether the skirting is staying or being replaced

  5. Doors to trim

    Every door that meets the new floor may need to come off and be cut down

    What helps: Count the doors that open onto the new floor

  6. Clearing the room

    Moving furniture and lifting old carpet, laminate or tiles all take time

    What helps: Tell us what's down now and what's in the room

  7. Stairs and thresholds

    Nosings, steps, bullnose ends and threshold strips are slow, careful cuts

    What helps: Point them out when you send photos

  8. Room shape

    Bays, chimney breasts, pipes and lots of door frames mean more scribing

    What helps: Send a rough sketch with the measurements

What our written quote lists

  • The floor area and the type of floor, including any pattern
  • What subfloor work is included, and what happens if more turns up
  • Who supplies the flooring, underlay and adhesive
  • Skirting: taken off and refitted, replaced, or beading
  • How many doors are trimmed, and threshold strips
  • Taking up and disposing of the old floor
  • Moving furniture, and who does it
  • Any moisture testing, and what happens if the screed isn't dry

Per square metre, or for the job?

Floor fitters often quote per square metre, which works for an empty, square room on a flat screed. It hides the rest: the subfloor, the skirting, the doors and the stairs, which tend to turn up later as extras. We'd rather see the room and give you one written figure for all of it. If you're comparing quotes, line them up against the list above. Our guide on how to compare builders' quotes goes through it in more detail.

Quick tool: Work out how many packs of flooring you needAbout a minute. Quantities only, no prices.

Send these measurements with your enquiry

Send us the room sizes, a photo of what's down now and the floor you've chosen, and we'll tell you what the subfloor needs first.

Get a quote

How to tell a floor has been laid right

Most of these are hidden once the floor is down, which is exactly why they get skipped. They decide whether a floor stays flat and quiet for years or starts to creak and gap after one winter.

  1. The shortcut

    Boards laid straight onto a dip or a hump in the subfloor

    What we do instead

    Subfloor checked for flatness and levelled to within 3mm over 2m first.

  2. The shortcut

    Wood laid on a new screed because it looks dry

    What we do instead

    Screed tested for moisture, and the floor laid when it passes, not before.

  3. The shortcut

    Scotia beading nailed along the skirting to cover the gap

    What we do instead

    Skirting off, floor laid into a 15mm gap, skirting back on top.

  4. The shortcut

    Boards cut round door architrave

    What we do instead

    Architrave and lining undercut so the boards slide underneath.

  5. The shortcut

    Boards fitted the day they're delivered

    What we do instead

    Boards left in the room with the heating on to acclimatise first.

  6. The shortcut

    Squeaky floorboards covered over

    What we do instead

    Loose boards screwed down before the new floor goes on top.

  7. The shortcut

    A pattern started against the nearest wall

    What we do instead

    A centre line set out first, so the pattern runs square to the room.

Questions people ask us about floors

Something else? Call or WhatsApp 07494 000065.

Can I have a wood floor over underfloor heating?

Yes, engineered wood suits it well, as long as the heating is commissioned before the floor goes down and the floor surface stays below 27°C afterwards. Solid wood is riskier, because it moves more as it heats and cools. Check the maker's guide for your boards, as some aren't suitable over heating at all.

Should I choose solid or engineered wood?

Engineered is more stable, so it's the safer choice over screed, over underfloor heating and in rooms where the temperature swings. Solid wood can be sanded more times over its life. If you choose engineered, look at the thickness of the top layer, because that decides how many times it can be sanded.

How long does wood flooring need to acclimatise?

Ted Todd's guidance is two to three days in the room it's going into, with the heating on and the room at normal living conditions. Other makers give their own times, so check the guide for the boards you've bought.

My screed is new. When can you lay the floor?

When it tests dry, not before. As a rough guide, cement screed dries at a day per millimetre for the first 40mm and two days per millimetre after that, so 65mm takes about 90 days. Anhydrite screed has to be drier still. A moisture test decides, not the calendar.

Do you take the skirting off?

Usually, yes. The floor runs under the skirting, so the expansion gap is hidden and there's no beading along the bottom. If your skirting is being replaced anyway, the new skirting goes on after the floor. If it's old and fragile, we'll talk to you about how best to take it off before we start.

Can you lay a new floor over tiles?

Sometimes. The tiles have to be flat, firmly stuck and sound, with no hollow ones. The bigger question is height: a new floor and underlay on top of tiles can leave doors catching and a step at every threshold, so we check the heights at the doors first.

Can you fix squeaky floorboards?

Yes, before the new floor goes down. Squeaks usually come from loose boards rubbing on nails or joists. We screw the boards down to the joists, pack any gaps and replace boards that are split or past saving. Fixing them first means the new floor isn't laid over a noise.

Do I need Building Regs for a new floor?

Usually not. Renovating more than half of a ground floor, such as digging out an old solid floor, can bring in insulation requirements, and electric underfloor heating on a new circuit is notifiable work for your electrician. In a listed building, check before lifting old boards.

My floor isn't flat. Does it matter?

If it's more than 3mm out over 2m, yes. Wood and laminate laid over a dip flex as you walk on them, which shows as creaking, joints opening and boards that feel springy. We level the subfloor first, with levelling compound on screed or by packing and planing joists.

What if the old floor has asbestos in it?

Old thermoplastic tiles and black bitumen adhesive can contain asbestos. If we find them, we stop and you get them tested before anything is lifted, sanded or drilled. If it's there, a specialist removes it, and we lay the new floor once they're done.

I live in a flat. Can I put a wood floor in?

Check your lease before you buy anything. Many leases restrict hard floors, or allow them only with an acoustic underlay so the neighbours below don't hear every footstep. Some need the freeholder's written consent first. Send us the wording if you're unsure, and we'll fit to whatever it asks for.

Can you replace floorboards damaged by a leak?

Yes, once the floor and what's under it have dried out. Laying new boards on a wet base just moves the problem along. We lift the damaged section, check the joists, then match or replace the floor. Our water-damaged joinery page covers the whole job.

Floor fitters town by town

We're based in Crawley and lay floors across West Sussex and Surrey. Pick your town for what changes a floor job there.

The towns we cover around our base in CrawleyCopthorneCrawley DownEdenbridgeForest RowHassocksHenfieldHurstpierpointLindfieldMersthamSouthwaterTadworthBillingshurstBurgess HillCaterhamCranleighCuckfieldDorkingEast GrinsteadGatwickHaywards HeathHorleyHorshamLingfieldOxtedRedhillReigate10 miles15 milesCrawley base
Distances are straight-line, from our base in Crawley. Small grey dots are villages we also cover.

Got a floor that needs laying?

Send us the room sizes, a photo of what's down now and the floor you've picked. We'll get back to you, check the subfloor, and send a written quote that says what the room needs.

Useful to send

  • The room sizes, or a rough sketch
  • A photo of the floor that's down now
  • Your postcode, and the flooring you've chosen