Floor fitting in East Grinstead

East Grinstead's High Street has one of England's longest runs of 14th century timber-framed buildings, and most of them are listed. Their floors have settled into falls the conservation guidance expects to stay. Away from the High Street the job is newer: flats and houses on screed, where moisture decides the start date.

Empty room with a newly laid glossy black and white plank floor in a bold herringbone pattern

Mid Sussex council and the RH19 postcode

Building control
Mid Sussex District Council Building Control
Highways and county
West Sussex County Council
Postcodes
RH19
From our base in Crawley
About 8 miles east
Where East Grinstead sits in relation to our base in CrawleyCopthorneCrawley DownEdenbridgeForest RowHassocksHenfieldHurstpierpointLindfieldMersthamSouthwaterTadworthEast GrinsteadBillingshurstBurgess HillCaterhamCranleighCuckfieldDorkingGatwickHaywards HeathHorleyHorshamLingfieldOxtedRedhillReigate10 miles15 milesCrawley base
Distances are straight-line, from our base in Crawley. Small grey dots are villages we also cover.

Listed floors on East Grinstead High Street

  • High Street listings

    The town has 89 list entries, and the conservation area appraisal says the High Street buildings are listed in the majority of cases. Assume yours is until the National Heritage List says otherwise.

    Official source

  • Settled falls

    The appraisal treats the uneven floors of the timber-framed buildings as part of their character. Levelling one, or gluing a new floor over old boards, is the kind of work that can need listed building consent.

    Official source

  • Two conservation areas

    East Grinstead, and Estcots and East Court, designated in 2003. Neither controls an internal floor in a house that isn't listed.

  • Work without consent

    Unauthorised works to a listed building are a criminal offence under section 9 of the Listed Buildings Act, whoever carried them out.

    Official source

Newer East Grinstead homes on screed

About a third of homes sold in RH19 are flats, and streets such as Queens Road, Cantelupe Road and Butlers Way have added houses and flats since 2015. Many of these have screeded floors. Our first visit is with a moisture meter and a long straight edge. A cement screed under wood or LVT should be at 75% relative humidity or below, and an anhydrite screed at 0.5% on a CM test, or 0.3% with heating in it. If it isn't there yet, we'd rather move the date than glue a floor to a wet slab.

With about 550 homes allocated at Imberhorne, there'll be more of this, not less.

Amtico, LVT or wood in an old timber-framed house

The flooring searches people type here lean towards products: Amtico, LVT, wood flooring. Each has its place, but in a timber-framed house we'd steer you away from a glue-down vinyl over historic boards. It's hard to reverse, and reversibility is exactly what the listing rules care about. A floating engineered floor over a thin felt or fibreboard layer can sometimes sit over old boards without touching them. Talk to the council before assuming even that's fine.

What East Grinstead owners ask about floors

Something else? Call or WhatsApp 07494 000065.

Our High Street building is listed. Can we have underfloor heating?

Possibly, but it's one of the harder asks. Lifting historic boards to fit heating, then relaying them, can need listed building consent, and the council may prefer a scheme that leaves the old floor alone. Get that answer first. If it's a yes, the heating is commissioned before we lay anything and the floor surface stays under 27 degrees.

Our Butlers Way house is a new build. When can we lay wood?

When the screed tests dry, and not before. A newly built house can feel dry long before its floor is. For engineered wood, a cement screed needs to read 75% relative humidity or under, the heating should have been on for five days, and the boards need two to three days in the room. That usually means planning a few weeks ahead.

We're in the Estcots and East Court conservation area. Can we change our floors?

Yes, as far as the conservation area goes. It was designated in 2003 to protect the look of the area, and a floor laid inside a house isn't development under planning law, so there's nothing to apply for. If your particular house happens to be listed, that's a different matter, and the National Heritage List will tell you.

What happens before the boards go down in East Grinstead

Every floor starts with the one under it. We take moisture readings, check flatness with a 2 metre straight edge, and fix squeaks or level the subfloor before anything is laid. The skirting usually comes off so the expansion gap hides beneath it, with no beading. We lay engineered and solid wood, laminate, LVT, herringbone and chevron, and the written quote lists what's included. More on how we approach floor fitting.