Floor fitting in Crawley
Crawley's flooring jobs split along neighbourhood lines. Three Bridges, Northgate and West Green are full of flats, where the lease often decides between wood and carpet. Newer houses in Forge Wood sit on screeds that have to test dry before anything goes down. We check both before we price.

Crawley borough, RH10 and RH11, and the edges other councils run
- Planning
- Crawley Borough Council
- Building control
- Crawley Building Control, the council's own service
- Highways and county
- West Sussex County Council
- Postcodes
- RH10, RH11, RH12
- From our base in Crawley
- Our home town
Which Crawley neighbourhood you're in changes the floor
Crawley isn't one housing stock. The 2021 Census puts flats at 42% of homes in Three Bridges and 36.6% in Northgate and West Green, while Tilgate and Bewbush are more than 60% terraced and over a third of Maidenbower is detached. The first neighbourhoods were begun between 1949 and 1961, so a house there may have had several floors laid since, and what's under the current one is often a surprise. Maidenbower was designated in 1986 and almost finished by 2000. Forge Wood, about 1,900 homes begun in 2014, was scheduled to be finished in 2026. Each of those means a different first question when we arrive.
Laying a hard floor in a Three Bridges or Northgate flat
Most leases for flats say something about floors. Some ban hard floors above ground level outright. Others allow wood, laminate or LVT over an acoustic underlay of a stated standard, and some want the freeholder's written consent first. Part E of the Building Regulations deals with sound between flats in new work, but it doesn't apply when you simply replace a floor finish, so the lease is the rule that bites.
Read it before you order anything. If it names an underlay or a test figure, send us that line and we'll match the build-up to it, which can mean a thicker underlay and a few millimetres more to take off the doors. We'd rather lose an hour reading paperwork than lay a floor the managing agent makes you lift.
Newer houses in Forge Wood and the moisture question
If your house is a recent build with a screeded ground floor, that screed held a lot of water when it was poured and gives it up slowly. Wood flooring makers such as Ted Todd ask for a cement screed at no more than 75% relative humidity, or 2% on a CM test. Anhydrite screeds have to be down to 0.5%, or 0.3% if heating runs through them. The rough drying rule is a day per millimetre up to 40mm and two days per millimetre beyond that, and never less than 30 days.
Where there's wet underfloor heating, it has to be commissioned before anything is laid. For LVT, Karndean asks for the heating off 48 hours beforehand and brought back up 2 degrees a day; for wood, the surface shouldn't go above 27 degrees. The meter sets the date, not the handover pack.
LVT in Crawley: what rigid core needs underneath
"LVT flooring Crawley" is one of the searches people type here, and it's a sensible floor for kitchens, halls and rented flats because it shrugs off water and wear. It's also the least forgiving of a bad subfloor. Glue-down LVT shows every lump in the screed, so it needs a smoothing compound first. Rigid core click LVT copes better, but it still wants the floor within 5mm over 3 metres and a 5mm gap at the walls. Karndean asks for the room at 18 to 27 degrees and the boxes opened 24 hours before laying.
In the older neighbourhoods we also look hard at what's coming up. The HSE lists PVC and thermoplastic floor tiles and bitumen adhesive among the materials that can contain asbestos, so if we find them we stop and get a sample tested.
The Maidenbower floor, July 2021
In July 2021 a 10mm oak effect plank floor went down over 4mm thermal underlay in a single storey rear extension in Maidenbower, for a customer who had been let down by another floor fitter. The photos show the spacers still in at the walls, which is how a floating floor should look before the skirting goes back: the gap is there on purpose, and the skirting covers it.

Watch a subfloor set out and a hallway laid
Two short clips from our Instagram, filmed on site.


Crawley flooring questions, flats to new builds
Something else? Call or WhatsApp 07494 000065.
Our flat is in Three Bridges. Can we have laminate instead of carpet?
Possibly, but the lease answers that, not us. Plenty of flat leases restrict hard floors, ask for an acoustic underlay or want the freeholder's consent in writing. Find the clause on floor coverings and send it over. If it allows a hard floor with a named underlay, we'll price that build-up and allow for the extra height at the doors.
Do I need permission for a new floor in a Crawley conservation area?
No. Crawley has 13 conservation areas, but laying a floor is work inside the house, and planning law doesn't treat interior work as development. A listed building is different: lifting historic boards or gluing over them can need listed building consent from the council, so check the listing first.
Our Forge Wood house is two years old. Is the screed dry by now?
Almost certainly, but we test it anyway. A reading takes a few minutes, and the floor maker's fitting guide asks for one before any wood or LVT goes down. If the house has wet underfloor heating, we'll also ask whether it has been run through a full commissioning cycle, because that changes how the screed behaves once the new floor is on.
Can you lay LVT over the old tiles in an older Crawley kitchen?
Sometimes. If the old tiles are flat, sound and well stuck, a smoothing compound over them can work. If they're thermoplastic or vinyl tiles in a house built or refitted before 2000, or they sit in black adhesive, we don't sand, scrape or drill them until a sample has been tested for asbestos. Then we work out the height at the doors and the back step.
How we go about a floor in Crawley
Every floor starts with the one under it. We take moisture readings, check flatness with a 2 metre straight edge, and fix squeaks or level the subfloor before anything is laid. The skirting usually comes off so the expansion gap hides beneath it, with no beading. We lay engineered and solid wood, laminate, LVT, herringbone and chevron, and the written quote lists what's included. More on how we approach floor fitting.