Decking in Crawley
We build timber and composite decks across Crawley, and here the ground under the garden matters more than the boards on top. The western neighbourhoods sit on Weald Clay that holds water and moves with the seasons, while much of the east is sandstone. We dig, look, then set the footings to suit.

Crawley Borough Council, RH10 and RH11
- Planning
- Crawley Borough Council
- Building control
- Crawley Building Control, the council's own service
- Highways and county
- West Sussex County Council
- Postcodes
- RH10, RH11, RH12
- From our base in Crawley
- Our home town
Same borough, two kinds of ground under the deck
Crawley is not one soil. On the west side, Weald Clay runs under Ifield, Langley Green, Gossops Green, Bewbush, Broadfield, West Green, Northgate and Southgate. Three Bridges, Pound Hill, Furnace Green, Maidenbower, Worth and the town centre are mostly on the sandstone of the Hastings Beds, and Tilgate has a fault running through it.
On the clay, water lies under a deck after rain, and the ground shrinks in a dry summer and swells again over winter. We keep timber off the soil, lay membrane over a free-draining base and take footings below the layer that moves, deeper still near trees. The council's own householder guide warns that soakaways may work less well on the clay soils covering much of the borough, so we never assume rain will simply vanish under the boards. On the sandstone side footings are usually shallower, but a trial hole still comes before the design.

Crawley planning points that change a deck
The 300mm line
If any point of a deck stands more than 300mm above the ground beside it, it counts as a raised platform and needs planning permission. On a garden that falls away, one corner can cross that line while the rest stays low, so we take levels at every corner.
Thirteen conservation areas, one of them an estate
Forestfield and Shrublands in Furnace Green is a conservation area covering a late 1960s and 1970s estate. Permitted development is tighter on designated land, so we check with the council before anything is planned.
The June 2026 householder guide
Crawley adopted its Householder Development SPD on 1 June 2026. It asks for garden buildings to stay clear of tree roots and canopies and is frank about clay and soakaways. We read both points across to how a deck's footings and drainage are set out.
Kilnwood Vale and Pease Pottage
Both feel like Crawley, but Kilnwood Vale is in Horsham District and Pease Pottage is in Mid Sussex. Any application from there goes to that council, not to Crawley Borough Council.
What Crawley homeowners ask before a deck goes in
Something else? Call or WhatsApp 07494 000065.
Is my part of Crawley on clay or sandstone?
As a rough guide, the west of the town is clay and the east is sandstone, but the boundary between them wanders. Tell us your street and we will check the geology map, then dig a test hole on the first visit. That hole sets the footing depth, not the postcode.
We bought in Forge Wood. Can we add a deck straight away?
Probably, but read the planning permission for your phase first. Large estates sometimes carry conditions that remove permitted development rights, and the decision notice on the council's register will say so. Forge Wood also kept its ancient woodland, so check where your boundary meets the trees before planning a deck in the far corner.
Our house is in the Forestfield and Shrublands conservation area. Does that matter for a deck at the back?
It can. The area covers a 1960s and 70s estate in Furnace Green, and designated land carries extra restrictions that a normal estate house does not. We check with the council before any work is planned, and the free householder pre-application advice the council offers is worth using for anything raised.
Our Tilgate garden is small and there's no side gate. Can you still build a deck?
Yes. Most Tilgate homes are terraced, so we plan for every joist and board to come through the house. We sheet the floors, cut outside and keep lengths short enough to turn in a hallway. A small deck still counts towards the half-of-the-garden limit along with any shed, so we measure what else is out there.
From the first visit to the last board
Every deck starts with a site visit. We take levels across the whole footprint, at the door threshold and at the damp proof course, and look at what the ground is made of. The written quote names the boards, the frame and what it all stands on. Posts and anything near the soil are Class 4 treated timber, composite goes on taped joists with stainless fixings, and the frame stays about 10mm off the wall. More on how we build decks.


