Decking in East Grinstead
East Grinstead is built along a ridge, and the decks that need the most thought are on the steep, wooded valley sides to the south. Sand over clay there brings springs and wet ground where the two meet, so we work out drainage, footings and the 300mm planning line before anyone chooses boards.

Mid Sussex council, RH19, ridge top and valleys
- Planning
- Mid Sussex District Council
- Building control
- Mid Sussex District Council Building Control
- Highways and county
- West Sussex County Council
- Postcodes
- RH19
- From our base in Crawley
- About 8 miles east
Sand on the ridge, clay in the valleys, springs in between
The town runs along a flat-topped ridge from Ashurst Wood to Imberhorne Lane, with steep wooded valleys cutting into its south side. Up on the ridge, gardens are flatter and a low deck off the back door is usually simple.
The valley sides are a different job. The ground is the Hastings Beds: Tunbridge Wells Sand and silt with bands of Grinstead Clay, sitting on Wadhurst Clay, often all within one street. Water drains down through the sand until it meets the clay and comes out as a spring, and that junction is where landslips tend to happen. It is not the Weald Clay people know from further north, and it behaves differently.
On a plot like that we look for the wet patches before setting anything out. Posts stay out of the softest ground, footings go down to firm material found in a trial hole, and anything that holds back soil gets drainage behind it. A stepped deck keeps each level close to the slope and spreads the load.

Where the town's planning rules reach the back garden
High Weald National Landscape
It covers the south and east edges of the town, and all of Ashurst Wood. Designated land comes with extra restrictions, so on those edges we check with the council before a deck is planned.
The Portlands
Behind the High Street lie the Portlands, once 47 long medieval strips. The block behind 58 to 84 High Street is the only one left whole, and the neighbourhood plan gives garden work there rigorous assessment.
Two conservation areas
The town conservation area takes in the High Street, Middle Row and parts of Ship Street and West Street. Estcots and East Court College Lane is the second. Rear gardens in both need checking before work.
New streets and estate conditions
Jacobs Rise, Cantelupe Road and the 550 homes allocated at Imberhorne are recent or coming. Estates can carry conditions that remove permitted development rights, and the decision notice on the Mid Sussex register says whether yours does.
Felbridge is in Surrey
Felbridge homes deal with Tandridge District Council, not Mid Sussex, even with an East Grinstead address.
East Grinstead deck questions from the valley sides
Something else? Call or WhatsApp 07494 000065.
Our garden drops into one of the valleys south of the town. Is a deck still a good idea?
Usually, if each level stays low. Any part of a deck more than 300mm above the ground next to it needs planning permission, and on a valley-side slope that line comes quickly. Stepping the deck down in two or three levels keeps most of it under, and it means smaller, shorter posts in ground that can be wet.
The bottom of our garden is always soggy. Why, and does it matter?
It is often the spring line, where water running through the sand meets the clay below and comes to the surface. It matters for footings. We keep posts out of the wettest ground, dig to firm material, and lift the frame high enough for air to move under it so the timber dries between showers.
Is composite worth it on a shady garden under trees?
It can be. Composite needs no oiling and copes with leaf litter better than bare softwood, but it wants joists closer together and a well ventilated frame, which shaded valley gardens need anyway. Timber costs less to start with and needs more care. Our composite and timber comparison goes through the trade-offs.
We're on one of the newer streets near Imberhorne Lane. Do we need permission?
Read your planning conditions first. Some recent permissions take away permitted development rights, and the Mid Sussex decision notice will say. If yours does not, a deck kept under 300mm that stays behind the front of the house, and with any sheds covers no more than half the garden, is normally allowed.
How a deck comes together, start to finish
Every deck starts with a site visit. We take levels across the whole footprint, at the door threshold and at the damp proof course, and look at what the ground is made of. The written quote names the boards, the frame and what it all stands on. Posts and anything near the soil are Class 4 treated timber, composite goes on taped joists with stainless fixings, and the frame stays about 10mm off the wall. More on how we build decks.


