Roofing in Crawley
Much of Crawley was built as a new town after the war, under concrete interlocking tiles, and soffits of that era can be asbestos insulating board. The council's householder guide, adopted in June 2026, now sets out where dormers belong. We do the roof timber, fascias and dormer framing.

Crawley Borough, 14 neighbourhoods, RH10 and RH11
- Planning
- Crawley Borough Council
- Building control
- Crawley Building Control, the council's own service
- Highways and county
- West Sussex County Council
- Postcodes
- RH10, RH11, RH12
- From our base in Crawley
- Our home town
The 2026 householder guide and other Crawley rules
Householder Development SPD
Adopted on 1 June 2026, it says dormers work best at the rear, set well below the ridge, in from the edges and lined up with the windows below. A flat-roofed dormer can be acceptable if it is well clad. It also asks for tile hanging to carry on where a house already has it.
Thirteen conservation areas
They run from Ifield Village and Worth to the neighbourhood centres at Gossops Green and Southgate, plus streets such as Sunnymead and Brighton Road. In any of them a dormer needs planning permission, and the council offers free pre-application advice to householders.
Gatwick crane permit
Most of Crawley lies within 6km of the airport, where cranes and tall plant need a Gatwick permit unless the equipment stays under 10m. A lorry crane lifting a dormer frame or a steel counts, so we book the lift with the permit in hand.
Asbestos in soffits
Soffit boards and the cement undercloak at the verge on houses of this era can contain asbestos. We don't cut or drill them until a sample has been tested, and asbestos insulating board has to be removed by a licensed contractor before any new fascia work starts.
Not all RH10 and RH11 is Crawley
Kilnwood Vale, Colgate, Faygate and Rusper sit in Horsham District, and Pease Pottage is in Mid Sussex. Which council covers your address decides the planning rules for a roof alteration, so we check that before anything else.
Concrete tiles, trussed roofs and the Northgate houses
The new town's roofs are mostly concrete interlocking tile over cut or trussed timber, and many have been up for sixty years or more. The common jobs on them are timber ones: fascias and soffits rotted behind the gutter, rafter feet softened by a slow leak, and garage flat roofs that need a new deck. On Furnace Green and Gossops Green, the 1960s semis often need the whole roofline renewed at once, with the soffits tested first.
Maidenbower and Forge Wood are later and built on trussed rafters. Trusses are engineered as a set, so cutting one for a loft hatch or a dormer means an engineer's design and usually new steel or timber to carry the load. We don't cut trusses on guesswork.
Northgate has 142 concrete houses built in 1955. They aren't conventional brick, so before any roof work there we want a survey that tells us what the structure is and how it has aged.
We haven't got a finished Crawley roof in our photo record yet. The pictures on this page are from other roofs we've framed.

Roofing questions from Crawley
Something else? Call or WhatsApp 07494 000065.
Do I need a Gatwick permit for roof work in Crawley?
Only for cranes and tall equipment. Within 6km of the airport, which covers most of Crawley, a crane or similar plant over 10m high needs a permit from Gatwick before it goes up. Scaffolding at normal house height stays under that. We apply when a job needs a lift, and allow time for it in the programme.
My soffits might be asbestos. Can you still replace the fascias?
Yes, but in the right order. A sample goes off for testing first. If the board is asbestos insulating board, a licensed contractor has to remove it, and we fit the new timber and fascias once they've finished. If it's asbestos cement, the rules are lighter, but it still isn't cut or broken on site.
Can I put a dormer on the front of my Crawley house?
Probably not without planning permission. Permitted development never covers a dormer on a roof slope that faces the road at the front, so it goes to the council, and the 2026 householder guide says dormers work best at the rear. Free pre-application advice is available, and it's worth using before anyone draws a front dormer.
My house in Maidenbower has a trussed roof. Can it take a loft room?
Often, but not by cutting the trusses. Each truss is designed to work with the others, so a loft room means an engineer's design, new floor joists and usually a steel or timber beam to take the load the trusses carried. We build to that design, and Crawley's building control team inspects it.
How a roof job runs with us
We start with a visit: up in the loft, round the outside, and onto the scaffold if one is already up. You get a written quote that lists what is in and what is out. Where building control or the council has a say, we tell you before work starts and book the inspections. The roofing page covers the work itself in more detail.