First and second fix in Billingshurst
We do first and second fix carpentry in Billingshurst, and the thing to know here is that a brick or tile-hung front can hide an oak frame. The parish has over 80 timber-framed buildings, about 20 of them in the village, so we find out what a wall is made of before fixing anything to it.

Horsham District, RH14, on Stane Street
- Planning
- Horsham District Council
- Highways and county
- West Sussex County Council
Timber frames behind brick, render and tile
The conservation area appraisal lists the giveaways of a hidden frame: a tall roof, an oddly placed chimney stack and openings that don't line up. Tithe and Causeway Cottages were once a single Wealden house, a sign of how much these buildings have been altered. On a frame like that, a new partition is scribed to timbers that have moved for centuries, and fixings go into the oak only where it's sound. About 103 buildings in the parish are listed, and inside those, works that affect the character need listed building consent from Horsham District Council.
Billingshurst questions on studwork and frames
Something else? Call or WhatsApp 07494 000065.
Who inspects a new stud wall in Billingshurst?
Sussex Building Control, the council team that also covers Crawley, or a registered building control approver. A new wall usually needs approval because it can change escape routes, sound between rooms and ventilation. We build to the stages the surveyor asks to see, and you keep the completion certificate.
Our house is on Amblehurst Green. Is the second fix any different?
No. Amblehurst Green, the development of more than 475 homes east of the village, is centuries younger than the High Street frames, so the job is ordinary studwork and lining rather than scribing to old oak. We still check for cables and pipes before fixing anything heavy, such as wall cupboards or a handrail.
How we quote and book the work
We take on first and second fix for builders and for homeowners. First fix is the timber that goes in before plaster: studwork, joists, door linings, stairs and boxing. Second fix follows the plasterer, with doors, skirting, architrave and ironmongery. We look at the drawings or the site, then send a written quote that lists what's in and what isn't. Our first and second fix carpentry page explains each stage.