Decking in Billingshurst

Billingshurst sits on heavy Weald Clay with bands of sandstone, so a deck here needs a drained base and footings below the clay that moves. One rule catches people out: a home created by a Class Q barn conversion has no permitted development rights for decking, so even a low deck needs planning permission.

Treated deck subframes on weed membrane across two levels of a large sloping garden

Horsham District Council, RH14, a Weald Clay village

Building control
Sussex Building Control, the council service for Horsham and Crawley
Highways and county
West Sussex County Council
Postcodes
RH14
From our base in Crawley
About 13 miles south-west
Where Billingshurst sits in relation to our base in CrawleyCopthorneCrawley DownEdenbridgeForest RowHassocksHenfieldHurstpierpointLindfieldMersthamSouthwaterTadworthBillingshurstBurgess HillCaterhamCranleighCuckfieldDorkingEast GrinsteadGatwickHaywards HeathHorleyHorshamLingfieldOxtedRedhillReigate10 miles15 milesCrawley base
Distances are straight-line, from our base in Crawley. Small grey dots are villages we also cover.

Barn conversions, new estates and the old village centre

  • Class Q conversions

    If your house became a home only through a Class Q change of use from an agricultural building, it has no Class E permitted development rights at all. A deck of any height then needs planning permission. Some farms around Billingshurst have used Class Q, and we ask how a converted property got its consent before we design.

  • Amblehurst Green and the newer estates

    Amblehurst Green added more than 475 homes east of the village, and the emerging district plan proposes about 1,000 more on Land East of Billingshurst. Estate permissions can remove permitted development rights, so we read yours before drawing.

  • Digging near Stane Street

    The High Street follows the Roman Stane Street, and the road and churchyard form an Archaeological Notification Area inside the conservation area. Groundworks there face extra controls, and that includes holes for deck footings.

  • Listed and timber-framed houses

    The parish has more than 80 timber-framed buildings and about 103 list entries. A deck within the curtilage of a listed building needs consent, however low it is.

  • The 300mm line

    Any point more than 300mm above the ground next to it turns a deck into a raised platform, which needs planning permission.

Heavy clay with sandstone bands: what sits under an RH14 garden

The British Geological Survey maps the High Street, the station and the Daux area on Weald Clay mudstone, and the neighbourhood plan describes the ground around the village as mainly heavy clay. There are harder bands within it. St Mary's stands on a sandstone outcrop, which gave the village its name, and there is sandstone again to the east around Amblehurst Green. To the west, around Roman Way and Jubilee Fields, river terrace sand and gravel lies over the clay.

For a deck, that means three different starts. On the mudstone, water lies on the surface after rain and the clay shrinks and swells through the year, so we strip the turf, lay membrane over a gravel base that drains away from the house, and take footings below the layer that moves. On a sandstone band the firm ground comes up sooner. On the western gravels drainage is better, though the clay is still underneath. A trial hole on the first visit tells us which one you have.

Treated deck joists on weed membrane with adjustable pedestal feet leading to a lower deck frame
Joists on adjustable feet over weed membrane, April 2026

Billingshurst questions about barns, estates and old roads

Something else? Call or WhatsApp 07494 000065.

We live in a converted barn outside the village. Do we need permission for a deck?

If the barn became a house under Class Q, yes, for any deck, because those homes have no Class E rights. If it was converted through a full planning permission, the answer depends on that permission's conditions. Your conveyancing papers or the council's register will show which route it took, and we read it with you.

We're on Amblehurst Green. What should we check first?

The decision notice for your phase, in case a condition removed permitted development rights. Then the ground: the east side of the village has sandstone bands within the clay, so footing depth can change across one garden. We dig a hole at the first visit rather than assume.

Our cottage is close to the High Street. Does the Roman road matter?

It can. Stane Street and the churchyard are an Archaeological Notification Area, so digging there is controlled more closely than elsewhere in the village. We check with Horsham District Council before setting out footings, and in the conservation area we also check whether the deck itself needs permission.

Building your deck: the steps we follow

Every deck starts with a site visit. We take levels across the whole footprint, at the door threshold and at the damp proof course, and look at what the ground is made of. The written quote names the boards, the frame and what it all stands on. Posts and anything near the soil are Class 4 treated timber, composite goes on taped joists with stainless fixings, and the frame stays about 10mm off the wall. More on how we build decks.

Grey composite deck and summerhouse at dusk with LED plinth lights set into the deck fascia
Finished deck with fascia lighting, May 2022