Decking in Burgess Hill

Burgess Hill was built from its own clay, and the same Weald Clay sits under most of its gardens. It shrinks in dry summers and swells in wet winters, more so near trees, so we set deck footings below that movement and check new-estate conditions at Brookleigh and Kings Weald before design.

Wide set of treated timber garden steps on cut stringers climbing a bank to a raised deck frame

Mid Sussex council, RH15, brick and tile clay country

Building control
Mid Sussex District Council building control (01444 477570) or a registered private approver
Highways and county
West Sussex County Council
Postcodes
RH15
From our base in Crawley
About 11 miles south
Where Burgess Hill sits in relation to our base in CrawleyCopthorneCrawley DownEdenbridgeForest RowHassocksHenfieldHurstpierpointLindfieldMersthamSouthwaterTadworthBurgess HillBillingshurstCaterhamCranleighCuckfieldDorkingEast GrinsteadGatwickHaywards HeathHorleyHorshamLingfieldOxtedRedhillReigate10 miles15 milesCrawley base
Distances are straight-line, from our base in Crawley. Small grey dots are villages we also cover.

A town made from its own clay, and decks that sit on it

Local brickworks and tile works supplied the Victorian town, and the old Keymer tile works and clay quarry, 19 hectares of it, is now the Kings Weald estate. That tells you what is under the lawn. The British Geological Survey puts the centre on Weald Clay mudstone, with harder sandstone beds towards Keymer Road and river terrace sand and gravel over the clay on the north side, towards Brookleigh.

Clay like this is good for bricks and awkward for anything resting on it. It holds rainwater at the surface, so a deck laid straight onto it stays damp underneath. In a dry summer it shrinks, more so within reach of a thirsty tree, then swells back in winter, and a shallow post moves with it. We strip the turf, put down membrane over a gravel base laid to fall away from the house, and take each footing below the layer that moves. The frame sits clear of the base so air can dry it out.

The Hambrook, a tributary of the Adur, runs through the town, so gardens on the low ground near it get a flood map check first.

Composite deck seen from the lawn with a stepped L shaped edge, fascia board and gravel margin
Gravel margin round a stepped deck edge, May 2022

Brookleigh phases, conservation areas and the county line

  • Brookleigh

    About 3,500 homes are planned under outline consent DM/18/5114 from October 2019, and each phase has its own reserved matters decision. Conditions on your phase decide whether permitted development rights survive, so that decision is the first thing we read.

  • Kings Way, Kings Weald and Fairbridge Way

    The other recent estates were built under their own permissions too. The Mid Sussex register holds each decision notice.

  • Three conservation areas

    Silverdale Road and Birchwood Grove Road (1982), St John's (1989) and Fairfield (1989), which has the largest concentration of small Victorian terraced houses in Mid Sussex. Designated land carries additional restrictions, so we check with the council before work is planned.

  • World's End and Lewes District

    Part of World's End lies in Wivelsfield parish, in Lewes District, East Sussex. Applications there go to Lewes rather than Mid Sussex.

  • Height

    A deck with any point more than 300mm above the ground beside it is a raised platform and needs planning permission.

What Burgess Hill owners ask about clay and new estates

Something else? Call or WhatsApp 07494 000065.

We've just moved into Brookleigh. Can we put a deck in?

Very likely, but read the reserved matters decision for your phase first, because estate permissions can remove permitted development rights. If yours does, a low deck needs a householder application. Either way the ground is Weald Clay with sand and gravel in places, and we dig a trial hole before choosing footings.

Our Fairfield terrace has a small garden. Is a deck worth doing?

Often, as a single low level off the back door. Fairfield is a conservation area, so we check the rules before design. In a terrace without side access the materials come through the house in lengths that turn in a hallway, and the deck still counts towards the half-of-the-garden limit with any shed.

Kings Weald was a clay quarry. Does that change the footings?

It means we look carefully. Quarried and restored land can hold placed fill as well as natural clay, so the first hole tells us what we are dealing with. If the ground is mixed, footings go down to firm natural material, and we would rather find that out at survey than halfway through the job.

The order we work in, survey to finished deck

Every deck starts with a site visit. We take levels across the whole footprint, at the door threshold and at the damp proof course, and look at what the ground is made of. The written quote names the boards, the frame and what it all stands on. Posts and anything near the soil are Class 4 treated timber, composite goes on taped joists with stainless fixings, and the frame stays about 10mm off the wall. More on how we build decks.

Treated timber deck joist frame wrapped in black joist tape on weed membrane in a large garden
Joist tape on a new frame, spring 2026