Cranleigh sits on Weald Clay that the village's own neighbourhood plan calls unsuitable for soakaway drainage, and parts of it flooded in 2013 and twice in 2016. A deck here has to send rainwater somewhere sensible, so we plan the base, the falls and the footings before anyone chooses boards.

Waverley council, GU6, clay under a gravel cap
- Planning
- Waverley Borough Council
- Building control
- Waverley Building Control
- Highways and county
- Surrey County Council
- Postcodes
- GU6
- From our base in Crawley
- About 13 miles west
Ground that won't take a soakaway, and where the rain goes instead
The British Geological Survey shows Weald Clay mudstone under the whole village, capped in the centre by river terrace sand and gravel, with alluvium along Cranleigh Waters on the western edge. The Cranleigh Neighbourhood Plan says much of the village lies on heavy clay that is unsuitable for infiltration drainage, records floods in December 2013, January 2016 and June 2016, and names Elmbridge Road as a road that floods in heavy rain. It also notes that recent estates were built on the natural flood plain south of the High Street.
Rain falls straight through deck boards, so the question is where it goes next. On clay it will not sink away, and a flat base under a deck becomes a shallow pond. We shape the gravel base to fall away from the house and lead the water out to a lawn or planted bed. It never goes into the foul drain, which the plan names as the major contributor to sewer flooding. Footings pass through the gravel cap, where groundwater can sit, and bear on the clay below the layer that moves.

New estates, the conservation area and a council change
New-build streets
About 850 new homes were sold in the Cranleigh post town between 2018 and 2025, with Longhurst Avenue and Hewitts Road seeing the most sales. Estate permissions can remove permitted development rights by condition, so we read yours first.
Cranleigh conservation area
It covers 22.35 hectares of the centre and The Common, holds one Grade II* and 23 Grade II listed buildings, and was last extended in 2016. Trees there, including the Norway maples first planted along The Common in 1904, need six weeks' notice before any work.
Surrey Hills edges
The village itself is outside the National Landscape. Natural England sealed a boundary variation order on 20 August 2026, which still awaits confirmation and may bring the line closer, so we check the address.
Which council
Cranleigh, Ewhurst and Alfold are Waverley Borough Council until West Surrey Council takes over on 1 April 2027. Over the county line, Rudgwick and Bucks Green come under Horsham District in West Sussex.
Cranleigh questions about flooding, drains and new houses
Something else? Call or WhatsApp 07494 000065.
Our new house is south of the High Street. Will water collect under a deck?
It can, if the base is flat. The neighbourhood plan says some recent estates were built on the old flood plain, so we check the flood map for your address, raise the frame enough for air to move, and shape the base so water runs out into the garden instead of sitting under the boards.
Can the rain off our deck go into the house drains?
Not into the foul drain. The neighbourhood plan calls surface water in the foul sewer the major contributor to sewer flooding. We spread it across a lawn or planted bed, or take it to a separate surface water drain if your house has one.
We live in Rudgwick. Is planning handled the same way?
No. Rudgwick and Bucks Green are in Horsham District, West Sussex, so applications go to Horsham District Council rather than Waverley. Rudgwick also has its own conservation area around old Church Street, so for a house there we check the boundary first.
What to expect from the survey onwards
Every deck starts with a site visit. We take levels across the whole footprint, at the door threshold and at the damp proof course, and look at what the ground is made of. The written quote names the boards, the frame and what it all stands on. Posts and anything near the soil are Class 4 treated timber, composite goes on taped joists with stainless fixings, and the frame stays about 10mm off the wall. More on how we build decks.