Decking in Dorking

Most of Dorking sits on Lower Greensand, which drains well and holds a footing, so the hard part of a deck here is height rather than ground. Gardens that climb or drop towards the hills pass the 300mm planning line quickly, so we work out levels, steps and balustrades before we price a single board.

Top down view of composite deck steps with mitred light treads and a dark landing below

Mole Valley council, RH4 and RH5, greensand hills

Building control
Southern Building Control Partnership
Highways and county
Surrey County Council
Postcodes
RH4, RH5, RH3, KT20
From our base in Crawley
About 11 miles north-west
Where Dorking sits in relation to our base in CrawleyCopthorneCrawley DownEdenbridgeForest RowHassocksHenfieldHurstpierpointLindfieldMersthamSouthwaterTadworthDorkingBillingshurstBurgess HillCaterhamCranleighCuckfieldEast GrinsteadGatwickHaywards HeathHorleyHorshamLingfieldOxtedRedhillReigate10 miles15 milesCrawley base
Distances are straight-line, from our base in Crawley. Small grey dots are villages we also cover.

Good sand, steep gardens: where a deck here gets tall

The sand under most of the town is kind to posts. It drains fast, so water does not pond under the boards, and it bears well once you are through the topsoil. What it does not give you is a flat garden. Plots behind the Victorian streets and up the hillsides rise or fall towards the greensand hills, and a deck that starts level with the back door can be well above the lawn a few metres out.

We usually answer that with levels: a top deck at the door, a step down to a second deck, and steps on cut stringers between them. Approved Document K gives the figures for stairs in homes, a rise of 150mm to 220mm and a going of 220mm to 300mm, and they make a sound starting point on a garden climb. Where an edge stays high, a balustrade is part of the design from the start.

Three places break the pattern. A band of Gault clay about 200m wide runs along the north bank of the Pipp Brook, and it shrinks and swells. Hand-dug sand caves run under parts of the old town. South of Dorking, the Holmwoods, Beare Green, Capel, Newdigate and Ockley sit on heavy Weald Clay, where footings go deeper or onto ground screws.

Treated timber garden steps running up an earth bank from a lower deck frame to a raised subframe
Steps on cut stringers between two deck levels, spring 2026

The conservation area, listed gardens and the Surrey Hills edges

  • Dorking conservation area

    Designated on 24 March 1974, it holds about 120 listed entries, and an Article 4 direction covers parts of it. Additional restrictions apply on designated land, so for a house in the centre we check with the council before work is planned.

  • Gardens of listed houses

    Permitted development for decks does not reach the curtilage of a listed building. If your house is listed, even a low deck at the back needs consent, and we draw it with that application in mind.

  • Surrey Hills edges

    The town centre is outside the National Landscape, but sampled points at Deepdene, Pixham and the southern fringe fall inside it. A proposed boundary change was submitted on 7 September 2026 and has not been confirmed, so we check your address on the council's map.

  • Pixham and the low ground

    The Environment Agency's Dorking flood area takes in some Pixham properties and parts of Brockham and Betchworth. On those plots we look at the flood map before we design the frame height.

Dorking deck questions about slopes, caves and clay

Something else? Call or WhatsApp 07494 000065.

Our garden climbs steeply behind the house. Will a deck need planning permission?

If any part ends up more than 300mm above the ground next to it, yes. On a steep plot that is easy to reach, so we look at stepping the deck into two or three lower levels or cutting it into the bank. If the height you want still needs permission, we draw it for an application. The decking height checker shows where your corners land.

We live in North Holmwood. Is the ground the same as in town?

No. The Holmwoods are on Weald Clay rather than greensand, and the clay holds water and moves between summer and winter, more so near big oaks. Footings go deeper, or we use ground screws, and the frame sits higher off the soil so air can move underneath.

Is a garden at Deepdene or Pixham in the Surrey Hills?

Possibly. Points we checked in both fall inside the National Landscape, while the town centre does not, and the line runs close to many streets. Designated land carries extra restrictions, so we look up the exact address. In Pixham we check the flood map as well, because the Pipp Brook joins the Mole there.

We're close to South Street. Do the sand caves matter for a deck?

They are worth knowing about. Caves and tunnels were dug by hand under parts of the old town, so near the centre we ask about cellars and watch what comes out of the first hole. A deck is light, but its posts still need solid ground to stand on.

What happens between the survey and the handover

Every deck starts with a site visit. We take levels across the whole footprint, at the door threshold and at the damp proof course, and look at what the ground is made of. The written quote names the boards, the frame and what it all stands on. Posts and anything near the soil are Class 4 treated timber, composite goes on taped joists with stainless fixings, and the frame stays about 10mm off the wall. More on how we build decks.