Cladding in Oxted

New Oxted's Edwardian streets have tile-hung gables, and where those streets fall in Station Road West or another conservation area, cladding needs planning permission. In Limpsfield, the Stanhopes houses of the late 1970s were tile-hung and weatherboarded on purpose, and the village appraisal protects that look as well.

Oxted, Limpsfield and Hurst Green under Tandridge

Building control
Southern Building Control Partnership (Tandridge's council building control)
Highways and county
Surrey County Council
Postcodes
RH8, RH9
From our base in Crawley
About 13 miles north-east
Where Oxted sits in relation to our base in CrawleyCopthorneCrawley DownEdenbridgeForest RowHassocksHenfieldHurstpierpointLindfieldMersthamSouthwaterTadworthOxtedBillingshurstBurgess HillCaterhamCranleighCuckfieldDorkingEast GrinsteadGatwickHaywards HeathHorleyHorshamLingfieldRedhillReigate10 miles15 milesCrawley base
Distances are straight-line, from our base in Crawley. Small grey dots are villages we also cover.

Oxted's four conservation areas, and no Article 4

  • Old Oxted, designated 1972

    Cladding any part of a house in the Old Oxted conservation area needs planning permission from Tandridge District Council.

  • Station Road West, Broadham Green and Spring Lane

    Both designated in 1990. Tandridge says certain types of cladding need permission in its conservation areas, and these two take in parts of the town built after the railway came.

  • Limpsfield village, designated 1972

    Its Conservation Area Appraisal and Management Plan of June 2022 describes the Stanhopes houses' tile hanging and weatherboarding as a deliberate part of their design.

  • No Article 4

    Limpsfield considered an Article 4 direction and decided against it, and none applies in Oxted, so the national permitted development rules are the starting point.

  • Surrey Hills

    The National Landscape covers the Downs above the M25, not the built-up streets of the town.

Tile-hung gables on New Oxted's Edwardian houses

Station Road East and West, Chichele Road, Detillens Lane and Bluehouse Lane have Edwardian houses with tile-hung gables. When a gable starts losing tiles, the cause is usually the battens or nails behind them rather than the tiles, so the gable can be stripped, re-battened over a breather membrane and re-hung with the same tiles, topped up with reclaimed ones. Inside the conservation areas, like for like repair of this kind keeps you out of the planning system. Changing the gable to boards does not.

Two volume flat roofed house clad in vertical and horizontal boards, partly hidden behind conifers

Hurst Green, Holland and the late 1970s Stanhopes

Hurst Green and Holland were built up in the 1960s and 1970s on Weald Clay, and neither has a conservation area, so cladding that looks similar to the existing house is permitted development there unless a planning condition says otherwise. On houses of that age, the HSE's advice that asbestos may be present applies, so soffits and panels are tested before anyone cuts them. In Limpsfield, the Stanhopes houses date from the late 1970s and early 1980s, and their boarding is part of the conservation area's character.

Looking up at a cantilevered timber clad first floor with a boarded soffit over render and sliding doors
Larch boarding and soffit, July 2024

Oxted and Limpsfield wall questions

Something else? Call or WhatsApp 07494 000065.

Our Chichele Road gable is losing tiles. Do we need planning to fix it?

Not if the tiles go back as they were. Re-battening a gable and re-hanging the same tiles, with matching reclaimed ones where some are broken, is repair rather than development. If the house is in a conservation area and you want boards instead of tiles, that is cladding, and it needs planning permission from Tandridge.

Can a Hurst Green house be re-clad in composite boards?

Normally without planning permission, since Hurst Green has no conservation area, as long as the new boards look similar to the existing finish. Walls within a metre of the boundary need a fire-rated board rather than standard composite, and stripping most of a wall brings in Building Control and an insulation upgrade.

Cladding in Oxted: the way we work

Boards go on treated battens over a breather membrane, with a gap behind them so air can move and water can drain, the way our reels show it. We measure each wall, work out the boards by their cover width and add a margin for waste, then check the fire class near boundaries and whether the council or Building Control need to see the job. More on our cladding work.