Cladding in Reigate
Reigate & Banstead has served Article 4 directions on most of its conservation areas, so in Reigate's older streets even a modest change to a wall's face can need planning permission. Elsewhere, the test is whether new boards look similar to the house. We find out which applies to your address before you choose a board.

Reigate & Banstead, the RH2 streets and the scarp above
- Building control
- Southern Building Control Partnership
- Highways and county
- Surrey County Council
- Postcodes
- RH2, RH3, KT20
- From our base in Crawley
- About 9 miles north
- Protected land nearby
- Reigate's five conservation areas, Article 4 directions, Surrey Hills National Landscape, Metropolitan Green Belt
Planning checks before a Reigate wall is re-clad
Reigate's conservation areas
Reigate itself (1973, extended in 2009), Somers Road (1990), Wray Common, Flanchford Road and Colley Lane, and Chart Lane. Cladding any part of a house in one of them is not permitted development. There is no Church Street conservation area, whatever some websites say.
Article 4 directions
The council says Article 4(2) directions have been served on most of its conservation areas. They take away some of the householder rights that remain, so the direction for your road is worth reading before anything is ordered.
Surrey Hills on the scarp
The National Landscape takes in the scarp at Reigate Hill and Colley Hill. Houses on that land cannot be clad in any material without planning permission.
Looking similar to the house
Away from designated land, cladding is permitted development only when the materials look similar to the existing house. Black boards on a red brick and tile-hung house are a change of look, and the council can say whether that needs an application.
Where to look it up
The council's Where I Live map shows whether an address is in a conservation area. On 1 April 2027 planning passes to East Surrey Council, so newer decision notices will carry that name.
Tile hanging over brick, the Reigate pattern
The council's Local Character and Distinctiveness Design Guide calls tile hanging above a brick or rendered ground floor a common feature of the borough, and Reigate has plenty of it. Hardwicke Road has late Victorian tile hanging, Evesham Road is tile hung, and the Somers Road conservation area was drawn round 1880s houses in the Old English style. The same guide treats boxed eaves as out of keeping. A re-clad that keeps the tiles, or replaces rotten battens behind them, sits well with all of that. Swapping them for boards is the bigger planning question.
Burnt Accoya going onto a Reigate house
Lewis Brothers Carpentry & Construction Limited posted this reel on 8 September 2025, location tagged Reigate, Surrey.

Why burnt Accoya, and where it can't go
Accoya is pine that has been acetylated, which makes it much more stable than ordinary softwood, and a burnt finish gives a deep black grain with no paint. It still burns, though. On a house up to 11 metres tall, any wall within a metre of the boundary needs cladding rated Class B-s3,d2 or better, and a burnt or oiled board doesn't reach that unless its supplier's certificate says so. HSE research published in 2024 also found open slatted timber carries a greater fire spread hazard than closed boarding, which counts on a detached house built close to its neighbour.

Repairing tile hanging or starting again
Replacing broken tiles and the battens behind them with matching tiles is repair. It changes nothing about how the house looks, so it normally needs no planning permission, even in a conservation area, unless the house is listed. A full strip and re-clad in a new material is different, and in Reigate that difference decides if you need an application. Re-clad a large part of a wall and Building Control will usually want the insulation upgraded at the same time, which thickens the wall and moves the window reveals out.

Getting scaffold up on Reigate's slopes and lanes
Reigate sits on a slope, with Folkestone Beds sand under the centre, Gault clay north of the railway and Weald Clay down at Woodhatch. On the hill roads the scaffold may need to step down the garden at the back, and on narrow lanes the delivery of long boards needs somewhere to unload off the road. We walk the site with that in mind before a date is set.

What Reigate owners ask before re-cladding
Something else? Call or WhatsApp 07494 000065.
Our house is on Somers Road. Can we put cedar on the gables?
Not without planning permission. Somers Road is a conservation area, where cladding any part of a house is outside permitted development, and an Article 4 direction may apply as well. The houses were built in the 1880s with tile hanging, so the council is likely to want that kept or repaired. The council's view comes first, before you spend anything on boards.
Is there really a Church Street conservation area in Reigate?
No. Some cladding sites name one, but the council's list for the town is Reigate, Somers Road, Wray Common, Flanchford Road and Colley Lane, and Chart Lane. Check your own address on the council's Where I Live map rather than trusting a web page, this one included.
We're on Reigate Hill. Does the Surrey Hills change anything for cladding?
Yes. Where a house is inside the Surrey Hills National Landscape, cladding any part of the outside in timber, plastic, tiles, render or stone needs planning permission. The boundary takes in the scarp at Reigate Hill and Colley Hill. The Green Belt, which covers much of the same land, doesn't restrict cladding on its own.
Who signs off the Building Regulations on a Reigate re-clad?
The Southern Building Control Partnership covers Reigate & Banstead, or you can use a registered private approver. No competent person scheme covers cladding, so where the regulations apply, for example when most of a wall is stripped and its insulation has to be brought up to standard, the work is notified to one of them.
Our method on a Reigate cladding job
Boards go on treated battens over a breather membrane, with a gap behind them so air can move and water can drain, the way our reels show it. We measure each wall, work out the boards by their cover width and add a margin for waste, then check the fire class near boundaries and whether the council or Building Control need to see the job. More on our cladding work.