The short answer: three routes an extension can take

Every house extension in England goes down one of three routes. The first is permitted development: planning permission already granted by the government, as long as the extension stays inside the limits in Class A of the General Permitted Development Order 2015. The second is prior approval, the larger home extension scheme, where the council asks the neighbours before you build. The third is a householder planning application.

Which route yours takes comes down to four things. How far it sticks out. How high it goes. Which side of the house it's on. And where the house is. A plain single storey extension on the back of an ordinary semi is usually permitted development. Put the same extension in a conservation area, or on an estate where the original permission took the rights away, and it may need an application.

Whichever route it takes, it still needs Building Regulations approval, covered further down. For the build itself and the part we play in it, see our house extensions page.

What are the permitted development limits for an extension?

Permitted development lets you extend a house with no application, as long as the extension stays inside fixed limits on depth, height, width and position, all measured against the original house. Break any one of them and the whole extension needs planning permission, not just the part that's over.

RuleWhat it means for youSource
Single storey rear extensionUp to 4 metres beyond the original rear wall of a detached house, or 3 metres for any other house, and no more than 4 metres high.GPDO 2015, Class A, A.1(f)
Larger home extensionUp to 8 metres for a detached house or 6 metres for others, single storey and still no more than 4 metres high. Needs prior approval, and isn't available on designated land.GPDO 2015, Class A, A.1(g) and A.4
Side extensionSingle storey, no more than 4 metres high, and no wider than half the width of the original house.GPDO 2015, Class A, A.1(j)
Extension of more than one storeyNo more than 3 metres beyond the original rear wall, and not within 7 metres of the boundary opposite that wall. Roof pitch to match the house as far as practicable.GPDO 2015, Class A, A.1(h) and A.3(c)
Height and eavesNo higher than the existing roof, eaves no higher than the existing eaves, and eaves no higher than 3 metres anywhere within 2 metres of a boundary.GPDO 2015, Class A, A.1(c), (d) and (i)
Position and coverageNothing beyond the front of the original house, or beyond a side wall that faces a road. With other buildings, no more than half the land around the original house covered.GPDO 2015, Class A, A.1(b) and (e)
Materials and upstairs windowsOutside materials of similar appearance to the house, except on a conservatory. Upstairs side windows obscure glazed, and fixed shut unless the opening part is over 1.7 metres above the floor.GPDO 2015, Class A, A.3(a) and (b)

Who signs it off

  • The council's planning team decides, and can confirm it with a lawful development certificate
  • We look at the likely route for your address before you pay for full drawings

Checked November 2026 against the GPDO 2015 and the Planning Portal

typical Victorian terrace backs
Illustration of typical Victorian terrace backs. Not a real address.

What counts as the original house, and why it matters

Every measurement runs from the original house: the house as first built, or as it stood on 1 July 1948 if it's older. A conservatory added in the 1990s isn't part of it, and the same limits apply to a new conservatory as to any extension.

Earlier extensions count against you too, because the limits apply to the total enlargement: the new part plus any existing extension it joins. Say there's a 2 metre conservatory across the back of your semi and you want to knock it into a deeper kitchen. The 3 metre limit is measured on the whole thing, so you've got 1 metre to play with, not 3. Take the conservatory down and build from the original wall and you're back to the full 3.

The half-the-garden rule works the same way. Extensions, sheds, garages and garden rooms all add up, and together they can't cover more than half the land around the original house.

Some things are never permitted development on an extension: a veranda, balcony or raised platform, any change to the existing roof, and a new chimney, flue or soil and vent pipe. That last one surprises people planning a downstairs toilet, so ask your designer early where the soil pipe will run.

Single storey rear extensions: the 3 and 4 metre rule

This is the one most people want, and it's the most generous route. Measure out from the original back wall: up to 3 metres on a semi or terrace, up to 4 metres on a detached house, and no more than 4 metres high at the top.

The rule that actually shapes the roof is a different one. Anywhere within 2 metres of a boundary, the eaves can't be higher than 3 metres. Most rear extensions on semis and terraces sit close to next door's fence, so that 3 metres decides the roof. A flat roof or a shallow lean-to fits under it easily. A pitched roof with a vaulted ceiling inside often needs the eaves dropped and the pitch worked out on paper before any timber's ordered. We'd much rather sort that on the drawing than on the scaffold.

The materials have to look similar to the house. Not the exact same brick, but a timber clad or rendered box on a red brick house may not count, which is one reason modern looking extensions often go through an application anyway.

Red brick single storey rear extension on a detached house with glazed doors and a hipped clay tile roof
A single storey brick extension on the back of a detached house, with a hipped plain tile roof.

The larger home extension: 6 or 8 metres with prior approval

The larger home extension scheme doubles the depth: up to 6 metres on a semi or terrace and 8 metres on a detached house. It's single storey only, still capped at 4 metres high, and every other limit still applies. It isn't available on designated land, which includes conservation areas and National Landscapes, or on a Site of Special Scientific Interest.

It isn't a planning application, but you can't just start either. Paragraph A.4 of the order sets out the steps:

  1. You send the council a written description: how far the extension sticks out beyond the original rear wall, its maximum height and its eaves height, with a plan and the addresses of every neighbouring property that adjoins your land.
  2. The council writes to those neighbours and gives them at least 21 days to comment.
  3. If anyone objects, the council judges the effect on all the adjoining properties, not only the one that complained.
  4. You can't start until the council tells you in writing that approval isn't needed or is given, or until 42 days pass with no decision. Then you build what you described.

Our view: it's a good route for a long kitchen-diner on a detached house with plenty of garden, and a poor one if the neighbours are already unhappy, because their objection is exactly what the council weighs. Knock on their door with the drawings first. A 6 metre wall along their fence is a lot to learn about from a council letter.

Side extensions and wrap-arounds

A side extension can be permitted development if it's single storey, no more than 4 metres high and no wider than half the width of the original house. That's usually enough to fill a side passage with a utility room, rarely enough for a full width kitchen.

Two catches. A side wall that faces a road is treated like the front of the house, which rules out most side extensions on corner plots. And on designated land, every side extension needs planning permission.

A wrap-around, side and rear in one L shape, has to meet the side limits and the rear limits at the same time, because it's one total enlargement. The half width cap on the side part is usually what pushes it into a householder application. In practice, most wrap-arounds need one.

Can a two storey extension be permitted development?

Sometimes, at the back. A rear extension of more than one storey can go up to 3 metres beyond the original rear wall, as long as no part of it is within 7 metres of the boundary opposite that wall. The roof pitch has to match the house as far as practicable. Any upstairs window in a side wall or roof slope must be obscure glazed and fixed shut, unless the opening part is more than 1.7 metres above the floor of the room.

The 7 metre rule alone rules out a lot of houses with short gardens. A room built on top of an existing single storey extension counts as two storey too.

A two storey side extension is never permitted development. Nor is any rear extension over one storey on designated land. So most two storey extensions go through a householder application.

Which route does your extension need?

A rough guide. The limits above decide it, and the council has the final word.

ExtensionUsual routeWhat can change it
Single storey rear, up to 3 metres (semi or terrace) or 4 metres (detached)Permitted developmentEarlier extensions, removed rights, eaves near the boundary
Single storey rear, up to 6 or 8 metresPrior approval (larger home extension)Not available on designated land; neighbour objections
Single storey side, no wider than half the housePermitted developmentA side wall facing a road; designated land
Wrap-aroundUsually a householder applicationA narrow side return can sometimes fit the limits
Two storey rear, up to 3 metresPermitted development if 7 metres clear of the rear boundaryDesignated land; a short garden
Any extension to a listed buildingListed building consent, plus planning where neededTalk to the council's conservation officer first

When permitted development doesn't apply to your house

Everything above assumes an ordinary house with its rights intact. These cases change the answer.

  • Flats and maisonettes. Extension rights apply to houses only, and not to houses that became homes through certain change of use rights, such as some office or barn conversions.
  • Designated land. Conservation areas, National Landscapes (the new name for Areas of Outstanding Natural Beauty), National Parks, the Broads and World Heritage Sites. Round here that means the High Weald and Surrey Hills National Landscapes, the South Downs National Park and conservation areas in many of the towns and villages we work in. On that land there are no side extensions, no rear extensions over one storey and no larger home extension under permitted development, and you can't clad the outside in stone, pebble dash, render, timber, plastic or tiles. So a timber clad extension in a conservation area needs an application.
  • Rights removed by condition. Many newer estates were given planning permission on condition that householders couldn't extend without applying. The condition sits in the original permission, not your deeds, so check the council's planning register.
  • Article 4 directions. A council can remove permitted development rights across a whole street or area.
  • Listed buildings. Any work that affects the character of a listed building needs listed building consent, whatever the planning position.

Planning is only half of it: Building Regulations

Most extensions, loft conversions and structural alterations need Building Regulations approval, even when they don't need planning permission. Permitted development says you're allowed to build it. Building Regulations say how: footings, steels, fire safety, insulation, ventilation and drainage. You can use your council's building control team or a registered private building control approver. Our guide to planning permission or Building Regulations explains how the two fit together.

One Building Regulations rule changes what people draw. In an extension, glazed area is normally limited to a quarter of the extension's floor area, plus any windows and doors it covers up. A designer can go further by showing the whole house still performs. Bifolds, a roof lantern and rooflights all count, so check it before the glass is ordered. And the Future Homes Standard won't change your extension: the 2027 changes don't change the insulation targets for extensions or renovations (our explainer has the detail).

A few things sit outside both systems. Digging foundations within 3 metres of next door's building, and deeper than its foundations, needs a party wall notice at least one month before (Party Wall etc. Act 1996), and on clay they usually are deeper. Owner-occupiers extending their home can usually claim an exemption from the Community Infrastructure Levy, but the claim has to be made before work starts.

New timber floor joists spanning between red oxide steel beams over a blockwork extension beside a brick house
Floor joists between steels on a blockwork extension. Planning doesn't look at any of this. Building control does.

How to be certain before you pay for drawings

Most of this can be settled in an evening, before anyone draws a line.

  1. Look up the planning history. Search your address on the council's online planning register for earlier extensions and any condition that removed householder rights.
  2. Check the designations. The council's website shows conservation areas and Article 4 directions. In the countryside, check whether you're in a National Landscape or the National Park.
  3. Measure from the original wall. Not from the back of the conservatory, not from the patio.
  4. Get it in writing. If it looks like permitted development, a lawful development certificate confirms it. It's optional, but it's a legal decision under section 192 of the Town and Country Planning Act 1990, and a buyer's solicitor will often ask for one when you sell.

A lawful development certificate and a householder application both have an eight week target for a decision once the council has validated them. Prior approval for a larger home extension runs to 42 days.

Questions we get asked about extension planning

Does a porch count as an extension?

No, porches have their own rules. A porch is permitted development if its ground area is no more than 3 square metres, it's no more than 3 metres high, and no part is within 2 metres of a boundary next to a road.

Are the permitted development rules about to change?

Permitted development rules for extensions, lofts and garden buildings haven't changed since 2024. The government consulted that year on bigger householder rights, but no change has been made. If that moves, we'll update this guide.

What this means if you're planning an extension

Find out which route your house is on before anyone draws anything. Ten minutes on the council's planning register can save you weeks. If it's permitted development, a lawful development certificate settles the question for good. If it needs an application, that's not the end of the world.

Either way, Building Regulations still apply, and that's where most of our work on an extension is: the frame, the joists, the roof and the openings for the glass. Send us the drawings, or photos and rough sizes if you haven't got drawings yet, and we'll tell you what we see. Our house extensions page covers the build.

Sources

  1. legislation.gov.uk: The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1 (Classes A and D), checked November 2026
  2. Planning Portal: Extensions, planning permission, checked November 2026
  3. GOV.UK: Permitted development rights for householders, technical guidance
  4. Planning Portal: Householder planning consent, checked November 2026
  5. Planning Portal: Lawful development certificates, checked November 2026
  6. legislation.gov.uk: Town and Country Planning Act 1990, section 192 (certificate of lawfulness of proposed use or development)
  7. legislation.gov.uk: Planning (Listed Buildings and Conservation Areas) Act 1990, section 7
  8. GOV.UK: Building regulations approval, checked November 2026
  9. GOV.UK: Approved Document L, Energy and greenhouse gas emissions (2026), para 10.8 on extension glazing
  10. legislation.gov.uk: Party Wall etc. Act 1996, sections 1, 3 and 6
  11. GOV.UK: Community Infrastructure Levy guidance, checked November 2026