New build houses in Redhill

We build the timber frame, roof and cladding of one-off houses around Redhill. The thing to check first is the ground: the town sits in a gap cut through the Greensand, fuller's earth was dug here until 2000, and some old pits were filled with rubbish. Made ground changes the foundation.

Reigate and Banstead council, the Greensand gap, RH1

Building control
Southern Building Control Partnership
Highways and county
Surrey County Council
Postcodes
RH1
From our base in Crawley
About 9 miles north
Where Redhill sits in relation to our base in CrawleyCopthorneCrawley DownEdenbridgeForest RowHassocksHenfieldHurstpierpointLindfieldMersthamSouthwaterTadworthRedhillBillingshurstBurgess HillCaterhamCranleighCuckfieldDorkingEast GrinsteadGatwickHaywards HeathHorleyHorshamLingfieldOxtedReigate10 miles15 milesCrawley base
Distances are straight-line, from our base in Crawley. Small grey dots are villages we also cover.

Two councils behind one Redhill postcode

  • Reigate and Banstead

    Built-up Redhill is Reigate and Banstead, outside the Green Belt. Earlswood Common, Salfords and the edges of town are Green Belt.

  • Tandridge villages

    Outwood, South Nutfield, Nutfield and Bletchingley use the Redhill post town but sit in Tandridge. Southern Building Control Partnership serves both councils, and both join East Surrey Council on 1 April 2027.

  • A plan at scoping

    Reigate and Banstead's Local Plan 2044 is at an early stage, after a consultation that ran between 14 September and 26 October 2026. Until it moves on, the 2014 Core Strategy and the 2019 Development Management Plan are what count.

  • Ground gas near old pits

    Where a plot is close to a former pit, building regulations Part C can call for ground-gas checks and protection under the floor.

Fuller's earth pits, Gault and made ground

Redhill sits in a water-cut gap through the Lower Greensand, with a narrow strip of Gault to the north and Weald Clay south at Earlswood and Salfords. Fuller's earth was extracted until 2000, and the council's own guidance says many exhausted quarries have been infilled with rubbish. Near Holmethorpe and the edge of Nutfield Marsh, a plot can sit on made ground.

None of that rules a house out. It means the ground investigation is the first document we want to see, because the engineer's foundation fixes where the sole plates go and how the frame is tied down.

Multi-room timber frame build under sheeted scaffold encapsulation, treated stud walls forming the upper floor
Treated stud walls forming the upper floor of a large frame, inside sheeted scaffold.

Brooks under the town and a stream that floods in winter

Redhill Brook runs in a culvert under the town centre and carries on through Earlswood. Salfords Stream floods in autumn and winter. If your plot is near either, the Environment Agency's long-term flood risk check and a drainage design belong at the start, ahead of any frame drawings.

We haven't built a house in Redhill and won't pretend otherwise. Our timber frame case study is outside our patch.

Softwood stud partitions and door openings on a first floor deck inside a timber frame under scaffold
Partition studs with noggings standing on the OSB deck of a timber frame first floor.

Redhill plots: what people ask

Something else? Call or WhatsApp 07494 000065.

How do we find out if our Redhill plot is on an old pit?

Start with the land search and the council's contaminated land records, then commission a ground investigation. Holmethorpe and the Nutfield Marsh edge carry the most quarrying history. If there's made ground, the engineer designs past it, and building regulations may need gas protection under the floor.

Our address says Redhill but the planning letter came from Tandridge. Why?

Outwood, South Nutfield, Nutfield and Bletchingley share the Redhill post town but sit in Tandridge district, which runs its own Green Belt policies. Both councils use the same building control partnership, so inspections work the same way either side of the line.

Is Redhill in the Green Belt?

The built-up town isn't. Earlswood Common, Salfords and the land round the edges are, and there a replacement house must stay in the same use and be no bigger in any material way than the one it replaces. Limited infilling in villages is the other route national policy allows.

Our part of a one-off house

We're carpenters, and on a one-off house our part is the structural timber: frame, floors, roofs, sheathing, cladding and the joinery after. Your groundworker, architect and other trades do theirs, and we work alongside them. Some owners run the build themselves; some appoint a main contractor. Tell us how you want to run it and we'll say where we fit. The new build houses page covers the scope in full.