Oak frame buildings around Gatwick

Charlwood, Hookwood, Smallfield, Burstow and Lowfield Heath all sit inside the 6km ring where Gatwick controls cranes and tall equipment. Add three councils, two flood-prone village centres and one of Surrey's densest clusters of medieval houses, and an oak frame here needs more checking than most.

Green oak two bay frame with braced posts and open rafters on a brick plinth in evening light
A two bay green oak frame on its brick plinth and slab, ready for the roof.

Three councils and the airport fence

Planning
Mole Valley District Council (Charlwood, Hookwood); Tandridge District Council (Smallfield, Burstow); Crawley Borough Council (Lowfield Heath)
Building control
Southern Building Control Partnership for the Surrey villages; Crawley Building Control for Lowfield Heath
Highways and county
Surrey County Council, with West Sussex County Council for Lowfield Heath
Postcodes
RH6, RH11
From our base in Crawley
About 3 miles north
Where Gatwick sits in relation to our base in CrawleyCopthorneCrawley DownEdenbridgeForest RowHassocksHenfieldHurstpierpointLindfieldMersthamSouthwaterTadworthGatwickBillingshurstBurgess HillCaterhamCranleighCuckfieldDorkingEast GrinsteadHaywards HeathHorleyHorshamLingfieldOxtedRedhillReigate10 miles15 milesCrawley base
Distances are straight-line, from our base in Crawley. Small grey dots are villages we also cover.

What the airport, the councils and the floods mean for a frame

  • Crane permit

    Inside 6km of the airport, any crane or tall plant needs a permit from Gatwick, with a fee, unless it stays under 10 metres or is shielded on every side by taller trees or buildings. Telehandlers aren't named in the rules, so we confirm our lifting kit with the airport's safeguarding team before raising day.

  • Who decides

    Charlwood and Hookwood are Mole Valley. Burstow and Smallfield are Tandridge. Lowfield Heath, with the airport itself, is Crawley Borough. Mole Valley and Tandridge share the Southern Building Control Partnership, and both pass to the new East Surrey Council on 1 April 2027.

  • Flood zones

    The centres of Hookwood and Smallfield are in Flood Zone 3, and the north end of Charlwood is Zone 2. The Smallfield Flood Alleviation Scheme is due by early 2027. For an oak car port or pavilion this mostly means taller plinths, so the end grain of each post sits well above any standing water.

Medieval cottages and heavy roofs in the conservation areas

Charlwood became a conservation area in 1974, and the parish has 85 listed buildings. The parish council counts 28 medieval open-hall cottages, more than any other Surrey village. Burstow has had its own conservation area since 1990, and Tandridge lists extra controls on outbuildings there.

A new oak porch on a listed cottage needs listed building consent before work starts, and building without it is a criminal offence. Some houses here, Tifters among them, carry Horsham stone slab roofs, which weigh far more than clay tile, so a frame meant to take one is engineered for that load from the start.

Inside a new oak framed garage with oak posts, tie beams and rafters over a boarded ceiling
Oak posts and tie beams carrying the roof inside a new oak framed garage.

Questions from the villages by the airport

Something else? Call or WhatsApp 07494 000065.

We're in Smallfield. Does flood risk stop us building an oak car port?

No, but check your address on the Environment Agency map first. A car port open on two or more sides and under 30 square metres is exempt from Building Regulations. We'd raise the posts on taller plinths or stainless shoes and fix everything with A4 stainless steel, which copes with wet oak and its tannin far better than ordinary steel.

Is Charlwood in the Green Belt, and does that stop a garden pavilion?

Most of Charlwood parish is Green Belt, but that alone doesn't remove permitted development for outbuildings. The conservation area matters more: there, no outbuilding can go between a side wall and the boundary without permission. Inside the curtilage of a listed house, outbuilding rights don't apply at all, so a pavilion beside one needs planning.

Steps between first visit and raising day

The oak frames page has the full picture, and the job runs the same way everywhere. A specialist framer cuts the oak; we set out the plinths, raise the frame by telehandler and peg the joints with a beetle. Send us a few photos, a rough size and what the building is for. We come and look at lorry access, the ground, the boundaries and the planning position, then send a written, itemised quote that names the frame maker.