House extensions in Lingfield

Lingfield village is inset from the Green Belt, but Dormans Park, Horne and Newchapel are washed over by it, and there Tandridge currently measures an extension against the house as it stood on 31 December 1968, by volume. In Dormans Park the private roads add their own rules for lorries.

Tandridge, the Eden Brook and RH7

Building control
Southern Building Control Partnership (Tandridge's council building control)
Highways and county
Surrey County Council
Postcodes
RH7, RH19
From our base in Crawley
About 9 miles north-east
Where Lingfield sits in relation to our base in CrawleyCopthorneCrawley DownEdenbridgeForest RowHassocksHenfieldHurstpierpointLindfieldMersthamSouthwaterTadworthLingfieldBillingshurstBurgess HillCaterhamCranleighCuckfieldDorkingEast GrinsteadGatwickHaywards HeathHorleyHorshamOxtedRedhillReigate10 miles15 milesCrawley base
Distances are straight-line, from our base in Crawley. Small grey dots are villages we also cover.

Green Belt, villages and private roads near Lingfield

  • Inset, defined or washed over

    Lingfield's built-up area is inset from the Green Belt under policy DP11, so ordinary design rules apply. Dormansland and Blindley Heath are Defined Villages under DP12, where extensions in keeping with the village are normally acceptable. Dormans Park, Horne and Newchapel are washed over and fall under DP13.

  • The 1968 volume test

    For a washed-over house, additions are judged against the dwelling as at 31 December 1968, measured as external volume including roof spaces and basements. The draft plan for 2027 to 2042 may drop the rule, so treat it as the current position rather than a permanent one.

  • Design statement and DP7

    Lingfield's Village Design Statement favours plain clay tiles over pantiles, red brick and broad weatherboarding. Policy DP7 expects about 22 metres between facing windows, which limits two storey rear extensions on shorter plots.

Brooks, flood warnings and the Dormans Park roads

The Environment Agency runs a Lingfield flood warning area on the Ray Brook and Eden Brook, and land near Gun Pond and the station falls in Flood Zones 2 and 3. A rear extension there needs a flood risk assessment and floor levels set with care. The ground is mostly Upper Tunbridge Wells Sand, giving way to Weald Clay north towards the Eden Brook.

Dormans Park has RH19 addresses but Tandridge planning, and its Roads Trust, set up in 1907, says the roads aren't for heavy lorries, contractors must make good any damage to roads or verges, and nobody parks on the roads. Blockwork and steel deliveries need planning around those rules.

Front of a plywood sheathed extension with wide glazing, an older tiled house standing behind it

Lingfield and Dormans Park questions

Something else? Call or WhatsApp 07494 000065.

Our house was extended in the 1980s. Does that count against us?

Outside the village, in the Green Belt, yes. Tandridge counts everything added since 31 December 1968 against the original volume, so the earlier extension uses part of the allowance. Inside Lingfield's inset boundary it still counts towards permitted development limits, which measure from the house as first built or as it stood in 1948.

Is Lingfield a conservation area?

Part of it. One conservation area covers Gun Pond, Church Town and the High Street, and the parish has 49 listed buildings. There's no published appraisal, so the officer works from the design statement and the buildings themselves. Inside the boundary a side extension always needs planning permission.

Who checks building regulations for a Lingfield extension?

The Southern Building Control Partnership, which serves Tandridge along with Mole Valley and Reigate and Banstead, or a registered private approver. Tandridge's planning work passes to the new East Surrey Council in April 2027, but the Local Plan policies above carry over until a new plan replaces them.

What we take on, and what we pass on

We build the frame, roof and joinery for house extensions: timber walls where the design calls for them, steels to your engineer's design, cut or trussed roofs, flat roof decks and the fitting out inside. For groundworks, brickwork, plumbing and electrics we'll recommend trades we've worked with. Building control inspects at the stages it sets, and you'll sign a short statement at completion.

How we build house extensions

Treated rafters for a long lean-to rear extension, fixed to a wall plate on a white rendered cottage